Error loading resource. Please reload page.

Austin/ SA 6.9

Initial Scope Performed Date
  • Market
  • Renovation Status
  • Initial Scope Performed Date
  • Initial Scope Approved Date
  • Estimated Completion Date
  • Rehab Verification Date
  • Rehab for Sale Days
  • Rehab Verified to ECD Delta
  • Dispo Status
  • General Contractor
  • 1/7/25 - 3/27/25
  • 3/27/25 - 4/3/25
  • 4/3/25 - 4/22/25
  • 4/22/25 - 5/5/25
  • 5/5/25 - 5/27/25
  • 5/27/25 -

Map settings

Image Export Format

Image Size

Property IDMarketAddressCityStateRenovation StatusRehab for SaleInitial Scope Performed DateInitial Scope Approved DateEstimated Completion DateRehab Verification DateRehab for Sale DaysRehab Verified to ECD DeltaClosing DateConstruction CommentsDispo StatusConstruction ManagerGeneral Contractor
Property IDMarketAddressCityStateRenovation StatusRehab for SaleInitial Scope Performed DateInitial Scope Approved DateEstimated Completion DateRehab Verification DateRehab for Sale DaysRehab Verified to ECD DeltaClosing DateConstruction CommentsDispo StatusConstruction ManagerGeneral Contractor
TX12993Austin1911 Timberwood DriveCedar ParkTXComplete Reviewed$5,6115/5/255/6/255/16/255/16/251005.30.25- DPCRCO#1 reviewed complete and approved for payment. JD 5.30.25 DPCRCO#1, VMace, complete and approved for payment, invoice attached, photos uploaded to RW-CF 5.19.25 - Approved CO1 at $575. LA 5.19.25 Added RFS Amt $5611.23 (PO Amt $5611.23 - Tenant Chg Back $0) -LN 5.19.25 Submit PO for DPCRCO #1. Updated RFS Amt $5612.66 ($5612.66-$0) LN 5.19.25 DPCRCO #1 Total $575.00 reveiwed and approved for PO. JD 5.19.25-DPCRCO#1, VMace Construction, submitted for approval $575-CF 5.17.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.16.25 FW passed submitted for review-CF 5.15.25- CO#1 Total $400.00- reviewed and approved for PO. JD 5.15.25 CO#1, VMace Const, submitted for approval $400-CF 5.14.25 Work complete, shower valve CO created, will FW after scope inspections are done-CF 5.8.25 Day 1 walk with GC-CF 5.6.25 Released POs to GC, promoted property to In Progress - LN 5.6.25 Added OECD 5.14.25 , verified bed+ bath count, Added DRE Amt $4637.66 (PO Amt $4637.66- Tenant Chg Back $0)-LN 5.6.25 - Approved scope at $4,637.66. LA 5.6.25-Disposition scope submitted for approval, RFS total: $4,637.66- CRM promoted to Inspection Reviewed status. JD 5.5.25-Disposition scope submitted for approval Total $4637.66. RR 4.30.25 Added-RW LN 4.30.25 - Inspection needed. Notes: Minor rehab to get the home cleaned. I didn’t see anything major. Budget is $8,000 to include the following: • Exterior power wash • Landscape maintenance (trim large overgrown trees, clean up weeds at front, possibly add mulch) • Full interior clean. • Replace burnt light bulbs. • Exterior trash out • HVAC service. LAListed For SaleClinton FryV-MACE CONSTRUCTION - V-MACE ENTERPRISES
TX12996Austin1304 Green Terrace DriveRound RockTXEscrow Repairs Needed$7,0875/6/255/6/255/16/255/16/251006/18/20256.9.25 Roof replacement complete, waiting on invoice from vendor-CF 6.3.25 Roof replacement scheduled for 6/5-CF 6.2.25 Submit PO for DERNCO #1. No change to RFS Amt due to PO being paid at closing. LN 6.2.25- Approved DERNCO 1 at $5,500. LA 6.2.25 DERNCO #1 Total $5,500.00 reviewed and submitted for approval. JD 6.1.25 DERNCO#1-GMunoz, submitted for approval $5500-CF 5.30.25 - Escrow repairs needed. Invoice to be paid at close. Closing on 6/18/25. Seller to replace the roof with architectural shingles by licensed/certified roofing contractor. New roof will need to be re-inspected by buyer’s inspector before closing. LA 5.19.25 Added RFS Amt $7086.69 (PO Amt $7644.25 - Tenant Chg Back $557.56) -LN 5.17.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.16.25 FW passed, submitted for review-CF 5.14.25 Work near completion, window install today-CF 5.8.25 Day 1 walk with GC-CF 5.6.25 Released POs to GC, promoted property to In Progress - LN 5.6.25 Added OECD 5.16.25 , verified bed+ bath count, Added DRE Amt $7086.69 (PO Amt $7644.25- Tenant Chg Back $557.56)-LN 5.6.25 - Approved scope at $7,644.25. LA 5.6.25-Disposition scope submitted for approval, RFS total: $7,644.25- CRM promoted to Inspection Reviewed status. JD 5.6.25-Disposition scope submitted for approval Total $7417.75. RR 5.5.25 Added-RW LN 5.4.25 - Inspection needed. Budget is $8,000 for rehab to include: Exterior power wash, Landscape maintenance (remove weeds, refresh mulch, remove vines off of home) , Full interior clean, Loft on 2nd floor has crack under window (per agent), Full interior paint, HVAC service. LASale PendingClinton FryV-MACE CONSTRUCTION - V-MACE ENTERPRISES
TX13170Austin287 Quarter AvenueBudaTXComplete Reviewed$5,7615/7/255/7/255/19/255/19/251205/20/25 Added RFS Amt $5760.98 (PO Amt $7350.58 - Tenant Chg Back $1589.60) -JZ 5.20.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.19.25 FW passed, submitted for review-CF 5.16.25 Confirmed work is complete, will final walk 5/19-CF 5.12.25 Paint in progress, garbage disposal delivered today-CF 5.8.25 Day 1 walk with GC-CF 5.7.25 Released POs to GC, promoted property to In Progress - LN 5.7.25 Added OECD 5.16.25, verified bed+ bath count, Added DRE Amt $5755.80 (PO Amt $7345.40- Tenant Chg Back $1589.60)-LN 5.7.25 - Approved scope at $7,345.40. LA 5.7.25-Disposition scope submitted for approval, RFS total: $7,345.40- CRM promoted to Inspection Reviewed status. JD 5.7.25-Disposition scope submitted for approval Total $7369.90. RR 5.5.25 Added-RW LN 5.4.25 - Inspection needed. Budget is $5,000 for rehab to include: Exterior power wash, Landscape maintenance (mow lawn, trim down bushes), Repair damaged exterior siding, Full interior clean, HVAC service. LAListed For SaleClinton FryV-MACE CONSTRUCTION - V-MACE ENTERPRISES
TX13543Austin292 Dandelion LoopKyleTXComplete Reviewed$05/5/255/6/255/12/255/12/25605.13.25 Added RFS Amt $0 (PO Amt $2391.73 - Tenant Chg Back $4701.66) -LN 5.13.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.12.25 FW Passed, submitted for review-CF 5.9.25 Site visit, final clean and tub repair in progress-CF 5.7.25 Day 1 walk with GC-CF 5.6.25 Released POs to GC, promoted property to In Progress - LN 5.6.25 Added OECD 5.12.25, verified bed+ bath count, Added DRE Amt $0 (PO Amt $2391.73- Tenant Chg Back $4701.66)-LN Specialty Vendors Added 5.6.25 - Approved $2,391.79. LA 5.6.25-Disposition scope submitted for approval, RFS total: $2,391.73- CRM promoted to Inspection Reviewed status. JD 5.6.25 Dispo scope submitted for review $2,241.73-CF 4.30.25 Added-RW LN 4.30.25 - Inspection needed. Notes: Minor rehab to get the home cleaned. I didn’t see anything major. Budget is $5,000 to include the following: Exterior power wash, Landscape maintenance (trim bushes at front, remove weeds, refresh the mulch, Exterior trash out (roof debris, roof replacement in progress), Full interior clean, HVAC service, repair as needed. Clean out garage floors. LAListed For SaleClinton FryREIGN CONSTRUCTION
TX14027Austin2003 Holly Springs DriveTaylorTXComplete Reviewed$05/14/255/15/255/22/255/22/25706/13/20255.23.25 Added RFS Amt $0 (PO Amt $2937.17 - Tenant Chg Back $5415.54) -LN 5.23.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.22.25 FW passed, submitted for review-CF 5.21.25 All work complete, will condense Final Walk days in Austin to 5/22-CF 5.20.25 HVAC Complete-CF 5.16.25 Day 1 walk with GC-CF 5.15.25 Released POs to GC, promoted property to In Progress - LN 5.15.25 Added OECD 5.21.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $2937.17- Tenant Chg Back $5415.54)-LN 5.15.25 - Approved scope at $2,877.17. LA 5.15.25- Disposition scope submitted for approval, RFS total: $2,877.17- CRM promoted to Inspection Reviewed status. JD 5.14.25 Dispo scope submitted for review $2877.17-CF 5.12.25 Added-RW LN 5.12.25 - Inspection needed. Note: There appears to be signs of shifting, cracks in the ceilings. Best to keep this to a minimal rehab for cleaning and safety hazards only. AS- IS sale. Budgeted $5,000 for rehab to include: • Exterior power wash • Landscape maintenance (mow lawn, trim trees at front, remove weeds) • Repair rotting fascia at front of home. • Interior trash out • Full interior clean. • Replace batteries in smoke detectors. • Reinstall doors that are removed from hinges. • HVAC service as needed. • Address any safety concerns.LASale PendingClinton FryV-MACE CONSTRUCTION - V-MACE ENTERPRISES
TX14687Austin146 Pebble Creek LaneBudaTXComplete Reviewed$3,2015/7/255/7/255/15/255/15/25805.30.25 5.16.25 Added RFS Amt $3200.66 (PO Amt $4025.66 - Tenant Chg Back $825) -LN 5.16.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.15.25 FW passed, submitted for review-CF 5.15.25 - Approved CO1 at $601. LA 5.15.25- CO#1 Total $601.00 reviewed and submitted for approval. JD 5.15.25 CO#1-VMace Const. submitted for approval $601-CF 5.14.25 Work nearly complete, Will perform final walk 5/15-CF 5.12.25 Site visit, work near completion-CF 5.9.25 Day 1 walk with GC-CF 5.7.25 Released POs to GC, promoted property to In Progress - LN 5.7.25 Added OECD 5.14.25 , verified bed+ bath count, Added DRE Amt $2599.66 (PO Amt $3424.66- Tenant Chg Back $825)-LN 5.7.25 - Approved scope at $3,424.66. LA 5.7.25-Disposition scope submitted for approval, RFS total: $3,424.66- CRM promoted to Inspection Reviewed status. JD 5.7.25-Disposition scope submitted for approval Total $3445.66. RR 5.5.25 Added-RW LN 5.4.25 - Inspection needed. Budget is $5,000 to include: Exterior power wash, Landscape maintenance (mow lawn, trim down bushes), Repair damaged exterior siding and around back door & window frames, Full interior clean, HVAC service. LAListed For SaleClinton FryV-MACE CONSTRUCTION - V-MACE ENTERPRISES
TX14888Austin7725 Buck Meadow DriveGeorgetownTXComplete Reviewed$05/6/255/7/255/14/255/14/25705/15/25 Added RFS Amt $ (PO Amt $2199.90 - Tenant Chg Back $3339.96) -JZ 5.15.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.14.25 FW Passed, submitted for review-CF 5.14.25 Work complete, will FW when dispo inspections are done-CF 5.12.25 CM in area on 5.14 for final walk. JD 5.12.25 Work complete, FW scheduled for 5.14 due to travel restrictions-CF 5.9.25 Day 1 walk with GC-CF 5.7.25 Released POs to GC, promoted property to In Progress - LN 5.7.25 Added OECD 5.12.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $2199.90- Tenant Chg Back $3339.66)-LN 5.7.25- Approved scope at $2,199. LA 5.7.25-Disposition scope submitted for approval, RFS total: $2,199.00- CRM promoted to Inspection Reviewed status. JD 5.7.25-Disposition scope submitted for approval Total $2199.90. RR 5.6.25 Added-RW LN 5.4.25 - No full rehab or scope needed here as subject is in good shape at interior. Home does need some exterior work. Budget is $2,500 for exterior power wash, and heavy landscape maintenance (lawns need to be mowed at front and backyard, heavy trimming of bushes, remove weeds, and heavy landscape debris at backyard). LAListed For SaleClinton FryV-MACE CONSTRUCTION - V-MACE ENTERPRISES
TX15570Austin108 Briarwood CourtKyleTXComplete Reviewed$6,6755/13/255/14/255/30/255/30/2516005.30.25 Added RFS Amt $6675.35 (PO Amt $6715.35 - Tenant Chg Back $40.00) -SJW 5.30.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.30.25 FW passed, submitted for review-CF 5.29.25 HVAC co work complete, ready for final walk-CF 5.28.25 - Approved CO1 at $705.LA 5.28.25- CO#1 Total $705.00-reviewed and submitted for approval. JD 5.28.25 CO#1-Air Perf Specialists-submitted for approval $705-CF 5.27.25 HVAC leak at schraeder valve, repair scheduled for 5/30-CF 5.22.25 Discovered leak in the hot water line during final walk, GC to repair 5.23-CF 5.20.25 HVAC complete-CF 5.15.25 Day 1 walk with GC-CF 5/14/25 Released POs to GC, promoted property to In Progress - JZ 5.14.25 Added OECD 5.23.25 , verified bed+ bath count, Added DRE Amt $6010.35 (PO Amt $6010.35- Tenant Chg Back $0)-LN 5.14.25 - Approved scope at $6,010.35. LA 5.14.25- Disposition scope submitted for approval, RFS total: $6,010.35 CRM promoted to Inspection Reviewed status. JD 5.13.25 Dispo scope submitted for review $6010.35-CF 5.12.25 Added-RW LN 5.12.25 - Inspection needed. Budgeted $7,000 for rehab to include: • Exterior power wash • Landscape maintenance (trim bushes, refresh mulch) • Address wood rot at exterior roof line. • Full interior clean • HVAC service • Address water intrusion at backyard door exterior side baseboard/siding. • Address safety hazards. LAListed For SaleClinton FryJ F PRICE LLC
TX15608Austin3006 Greenlawn StreetTaylorTXComplete Reviewed$05/29/255/30/256/9/256/9/251006.9.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 6.9.25 FW passed, submitted for review-CF 6.5.25 Work complete, FW 6/6-CF 6.2.25 Day 1 walk with vendor-CF 6.2.25 Released POs to GC, promoted property to In Progress - LN 6.2.25 Added OECD 6.9.25 verified bed+ bath count, Added DRE Amt $2727.90 (PO Amt $3726.40- Tenant Chg Back $998.50)-LN 5.30.25 - Approved scope at $3,726.40 LA 5.30.25-Disposition scope submitted for approval, RFS total: $3,726.40- CRM promoted to Inspection Reviewed status. JD 5.30.25 Dispo scope submitted for review $3,726.40-CF 5.28.25 Added-RW LN 5.28.25 - Inspection needed. Note: Reason for sale is partially due to foundation concerns. Keeping rehab light. Budgeted $5,000 to include Exterior power wash, Landscape maintenance (trim and refresh mulch), Roof assessment for repair/replacement, Replace damaged window screens, Full Interior clean, add any other safety related items.LAListed For SaleClinton FryREIGN CONSTRUCTION
TX20886Austin2911 Crownover StreetAustinTXComplete Reviewed$6,6722/21/252/22/253/10/253/5/2511-56/13/202503.05.25 Added RFS Amt $6672.46 (PO Amt $11195.42 - Tenant Chg Back $4522.96) -SJW 3.5.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 3.5.25 FW Passed, submitted for review-CF 3.4.25 - Approved CO1 at $400. LA 3.4.25 CO #1 Total $400 reviewed and submitted for approval. JD 3.4.25 Roof replacement scheduled for 3.5.25-CF 3.3.25 Added +7 days to ECD. LN 3.3.25-CO#2 Total $6,625.00 reviewed and submitted for approval. JD 3.3.25 CO#2, G Munoz Ent, submitted for approval $6625-CF 2.28.25 CO#1, VMace Const, submitted for approval $400-CF 2.27.25 Work in progress, hvac and cleaning scheduled for 2/28-CF 2.25.25 Day1 walk with vendor-CF 2.24.25 Released POs to GC, promoted property to In Progress - LN 2.24.25 Added OECD 3.3.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $4170.42- Tenant Chg Back $4522.96)-LN 2.22.25 - Approved scope at $4,420.42. LA 2.22.25 -Disposition scope submitted for approval, RFS total: $4,420.42- CRM promoted to Inspection Reviewed status. JD 2.21.25 Dispo scope submitted for review $4,420.42 2.20.25 Scope scheduled for 2.21-CF 2.19.25 Added-RW LN 2.19.25 - Inspection needed. Budgeted $10,000 for rehab to include: Exterior power wash, landscape maintenance (refresh mulch, trim down bushes, remove weeds), full interior clean, roof assessment (agent noted missing/raised shingles), repair/paint exterior rotted wood trim. LASale PendingClinton FryV-MACE CONSTRUCTION - V-MACE ENTERPRISES
TX21352Austin8008 Cottage Rose DriveAustinTXComplete Reviewed$04/30/255/27/256/2/255/30/253-305.30.25 RFS Amt $0 (PO Amt $3150.00 - Tenant Chg Back $0) -SJW - (PO Amt $3150.00 – Accrued Prop Loss - SJW 5.30.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.30.25 FW complete and submitted for review-CF 5.27.25 Released POs to GC, promoted property to In Progress - LN 5.27.25 Added OECD 6.2.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $3150- Tenant Chg Back $)-LN Accrued Property Loss 5.27.25- CO #1 Accrued Property Loss Total $3,150.00 approved. JD 5.23.25- Disposition scope submitted for approval, RFS total: $0.00, CO#1 Accrued Property loss $3,150.00- CRM promoted to Inspection Reviewed status. JD 5.20.25 CO#1, Accrued Property Loss, White Wing, submitted for approval $3150-CF 5.14.25 Received demo bid $3,150.00-CF 5.14.25 Followed up with GC to obtain quotes-CF 5.9.25 GC waiting on structural roof quote-CF 5.6.25 Followed up with GC to obtain quote. Should receive information this week-CF 4.30.25 Photos submitted to RW- met with GC to go over trash out and build back quote-CF 4.29.25 Added-RW LN 4.28.25 - Build back estimate needed for fire damaged home. Subject suffered from fire damage primarily on the 2nd floor (lightening strike).ValuationClinton FryWHITE WING CONSTRUCTION SERVICES
TX21369Austin8000 Dampton LaneAustinTXComplete Reviewed$4,6763/27/253/27/254/4/254/4/25804/4/25 Added RFS Amt $4675.50 (PO Amt $4863.50 - Tenant Chg Back $188.00) -JZ 4.4.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.4.25 FW passed, submitted for review-CF 3.30.25 Day 1 walk with vendor-CF 3.27.25 Released POs to GC, promoted property to In Progress - LN 3.27.25 Added OECD 4.4.25, verified bed+ bath count, Added DRE Amt $4675.50 (PO Amt $4863.50- Tenant Chg Back $188)-LN 3.27.25 - Approved scope at $4,863.50. LA 3.27.25-Disposition scope submitted for approval, RFS total: $4,863.50- CRM promoted to Inspection Reviewed status. JD 3.27.25- Dispo scope submitted for review $4833.50-CF 3.26.25 Added-RW LN 3.26.25 - Inspection needed. Budgeted $6,500 for rehab to include • Front door paint • Exterior siding is pulling away from the home at the side. Repair. • Full interior clean (paint marks on LVP in closets and rooms) • Paint exterior side of backdoor to the backyard. • Replace rusted door knob at back patio door. • Paint stair walls due to mismatched paint. • Master bedroom ceiling fan is not working; however, lights work. LAListed For SaleClinton FryV-MACE CONSTRUCTION - V-MACE ENTERPRISES
TX21383Austin8017 Turnberry LaneAustinTXComplete Reviewed$03/28/253/31/254/4/254/4/25404/4/25 Added RFS Amt $0 (PO Amt $1372.15- Tenant Chg Back $1680)- JZ 4.4.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.4.25 FW passed, submitted for review-CF 4.1.25 Day 1 walk with vendor-CF 3.31.25 Released POs to GC, promoted property to In Progress - LN 3.31.25 Added OECD 4.4.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $1372.15- Tenant Chg Back $1680)-LN 3.31.25 - Approved scope at $1,372.15. LA 3.31.25-Disposition scope submitted for approval, RFS total: $1,372.15- CRM promoted to Inspection Reviewed status. JD 3.30.25 Dispo scope submitted for review $1372.15 -CF 3.26.25 Added-RW LN 3.26.25 - Inspection needed. Budgeted $3,500 for rehab to include: • Exterior power wash • Front door paint • Full interior clean • Repair top stair step transition piece • Add any other safety related items. LAListed For SaleClinton FryREIGN CONSTRUCTION
TX21391Austin5816 Monmarte CoveAustinTXComplete Reviewed$5,6805/5/255/6/255/15/255/15/25905.16.25 Added RFS Amt $5679.90 (PO Amt $5685.90 - Tenant Chg Back $6) -LN 5.16.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.15.25 Final Walk passed, submitted for review-CF 5.14.25 Work complete, will FW after dispo inspections are done-CF 5.12.25 Paint complete, final clean 5.13-CF 5.9.25 Paint in progress-CF 5.7.25 Day 1 walk with GC-CF 5.6.25 Released POs to GC, promoted property to In Progress - LN 5.6.25 Added OECD 5.15.25 , verified bed+ bath count, Added DRE Amt $5685.90 (PO Amt $5685.90- Tenant Chg Back $0)-LN 5.6.25 - Approved scope at $5,685.95. LA 5.6.25-Disposition scope submitted for approval, RFS total: $5,685.90- CRM promoted to Inspection Reviewed status. JD 5.6.25 Dispo scope submitted for review $5,685.90-CF 4.28.25 Added-RW LN 4.280.25 - Inspection needed. Budget is $4,500 for rehab to include: Exterior power wash, Landscape maintenance (minor trimming of bushes at front, refresh landscape, mow and edge), Exterior trash out, Full interior clean. Paint patches in several bedrooms, can we paint corner to corner to match? Address any other safety concerns.LAListed For SaleClinton FryREIGN CONSTRUCTION
TX21393Austin8009 Turnberry LaneAustinTXComplete Reviewed$5,5004/30/255/2/255/14/255/14/251205/15/25 Added RFS Amt $5499.65 (PO Amt $5998.65 - Tenant Chg Back $499) -JZ 5.15.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.14.25 FW passed, submitted for review-CF 5.14.25 Work complete, will FW after dispo inspections are done-CF 5.12.25 Finishing remaining items and final clean today-CF 5.9.25 paint complete-CF 5.7.25 Day 1 walk with GC-CF 5.5.25 Released POs to GC, promoted property to In Progress - LN 5.2.25 Added OECD 5.14.25, verified bed+ bath count, Added DRE Amt $5998.65 (PO Amt $5998.65- Tenant Chg Back $0)-LN 5.2.25 - Approved scope at $5,998.65.LA 5.1.25- Disposition scope submitted for approval, RFS total: $5,998.65- CRM promoted to Inspection Reviewed status. JD 4.30.25 Dispo scope submitted for review $5998.65-CF 4.28.25 Added-RW LN 4.28.25 - Inspection needed. Budget is $2,500 for rehab to include: Exterior power wash, Landscape maintenance (minor trimming of bushes at front, refresh landscape, mow and edge), Full interior clean, Address any other safety concerns. LAListed For SaleClinton FryV-MACE CONSTRUCTION - V-MACE ENTERPRISES
TX21415Austin8108 Turnberry LaneAustinTXComplete Reviewed$03/28/253/31/254/4/254/4/25404/5/25 Added RFS Amt $ (PO Amt $1677.32 - Tenant Chg Back $3781.84) -JZ 4.5.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.4.25 FW passed, submitted for review-CF 4.1.25 Day 1 walk with vendor-CF 3.31.25 Released POs to GC, promoted property to In Progress - LN 3.31.25 Added OECD (4/4) , verified bed+ bath count, Added DRE Amt $0 (PO Amt $1,677.32 - Tenant Chg Back $3,781.84)-MLD 3.31.25 - Approved scope at $1,677.32. LA 3.31.25-Disposition scope submitted for approval, RFS total: $1,677.32- CRM promoted to Inspection Reviewed status. JD 3.30.25 Dispo scope submitted for review $1,677.32-CF 3.26.25 Added-RW LN 3.26.25 - Inspection needed. Budgeted $7,000 for rehab to include: • Exterior power wash (driveway stains) • Landscape maintenance (some dead plants at the front need replacement, remove weeds) • Full interior clean (paint marks on LVP floors throughout) • Poor shoe mold job in half bath, clean up. • Clean kitchen counters • Bedroom 1 upstairs flooring has gaps in between joints, repair as needed. • Master bathroom shower trim loose, attach. • Master bathroom LVP floor around toilet is damaged, agented soft spot on the floor due to possible leak. Investigate and repair as needed. LAListed For SaleClinton FryREIGN CONSTRUCTION
TX21436Austin5707 Gerard DriveAustinTXComplete Reviewed$2,5454/30/255/2/255/12/255/12/251006/16/20255.13.25 Added RFS Amt $2545.11 (PO Amt $ 2806.27- Tenant Chg Back $261.16) -LN 5.13.25 Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.12.25 FW passed. submitted for review-CF 5.8.25 Appliances delivered-CF 5.6.25 Day 1 walk with GC-CF 5.5.25 Released POs to GC, promoted property to In Progress - LN 5.2.25 Added OECD 5.12.25 , verified bed+ bath count, Added DRE Amt $2508.74 (PO Amt $2769.90- Tenant Chg Back $261.16)-LN 5.2.25 - Approved scope at $2,769. LA 5.1.25-Disposition scope submitted for approval, RFS total: $2,769.90- CRM promoted to Inspection Reviewed status. JD 5.1.25 Revised scope submitted for review $2769.90-CF 4.30.25 Dispo scope submitted for review $2,749.90-CF 4.28.25 Added-RW LN 4.28.25 - Inspection needed. Note: Light clean up and repair here, not much needed. Budget is $3,500 for rehab to include: Exterior power wash, Landscape maintenance (minor trimming of bushes at front, refresh landscape, mow and edge), Address erosion at sides of the home, under AC unit pad, Full interior clean, Address any other safety concerns. LASale PendingClinton FryV-MACE CONSTRUCTION - V-MACE ENTERPRISES
TX21442Austin5813 Kara DriveAustinTXComplete Reviewed$1,4994/30/255/2/255/9/255/9/25705/11/25 Added RFS Amt $1798.70 (PO Amt $1498.70 - Tenant Chg Back $0) -JZ 5/9/25 Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.9.25 Final walk passed, submitted for review-CF 5.6.25 Day 1 walk with GC, Pest control scheduled for 5/7-CF 5.5.25 Released POs to GC, promoted property to In Progress - LN 5.2.25 Added OECD 5.9.25, verified bed+ bath count, Added DRE Amt $1498.70 (PO Amt $1498.70- Tenant Chg Back $0)-LN 5.2.25 - Approved scope at $1,498.70. LA 5.1.25-Disposition scope submitted for approval, RFS total: $1,498.70- CRM promoted to Inspection Reviewed status. JD 4.30.25 Revised scope submitted for review $1498.70-CF 4.30.25 Dispo scope submitted for review $1438.70-CF 4.28.25 Added-RW LN 4.28.25 - Inspection needed. Note: Light clean up here, not much needed. Budget is $2,500 for rehab to include: Exterior power wash, Landscape maintenance (minor trimming of bushes at front, refresh landscape, mow and edge), Full interior clean, Address any other safety concerns. LAListed For SaleClinton FryREIGN CONSTRUCTION
TX12250San Antonio6815 Cougar CoveSan AntonioTXComplete Reviewed$425/6/255/12/255/19/255/19/25705/20/25 Added RFS Amt $41.64 (PO Amt $3011.88 - Tenant Chg Back $2970.24) -JZ 5.20.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.19.25 FW Passed, submitted for review-CF 5.16.25 Final clean today-CF 5.13.25 Day 1 Walk with GC-CF 5.12.25 Released POs to GC, promoted property to In Progress - LN 5.12.25 Added OECD 5.19.25 , verified bed+ bath count, Added DRE Amt $41.64 (PO Amt $3011.88- Tenant Chg Back $2970.24)-LN 5.12.25 - Approved scope at $3,011.88. LA 5.12.25- Revised scope for as-is items only- Disposition scope submitted for approval, RFS total: $3,011.88- CRM promoted to Inspection Reviewed status. JD 5.12.25 Revised scope to reflect as-is items only, submitted for approval $4307.82-CF 5.7.25-Disposition scope submitted for approval, RFS total: $17,819.76- CRM promoted to Inspection Reviewed status. JD 5.7.25- CM to make edits and resubmit. JD 5.6.25 Dispo scope submitted for review $18,414.76-CF 5.5.25 Added-RW LN 5.4.25 - Inspection needed. Budget is $20K for rehab to include: • Exterior power wash • Exterior trash out (heavy fence debris at side of the home and backyard) • Landscape maintenance ( overgrown lawns need to be mowed, remove weeds, trim tree at front) • Full interior deep clean • Full interior paint (strong animal smell) • Agent reported active German cockroach infestation • Replace carpet at staircase, hallways, bedrooms, and loft on 2nd floor. • Drywall repairs • Full interior clean • Reinstall kitchen appliances • Repair kitchen cabinet drawers with missing covers. • Reinstall bathroom drawers • Replace missing light bulbs/smoke detector batteries. • HVAC service. LAListed For SaleClinton FryJ F PRICE LLC
TX12868San Antonio6139 Wood BayouSan AntonioTXComplete Reviewed$4,9124/8/254/9/254/21/254/18/259-36/24/20254/18/25 Added RFS Amt $4912.10 (PO Amt $7978.25 - Tenant Chg Back $3066.15) -JZ 4..18.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.18.25 FW Passed, submitted for review-CF 4.17.25 Roof replacement complete-CF 4/15/25 processed CO 1 added 6 days to ECD. JZ 4.14.25 Roof replacement scheduled for 4/16-CF 4.9.25 - Approved CO1 at $6,095. LA 4.9.25 Released POs to GC, promoted property to In Progress - LN 4.9.25- CO #1 Total $6,095 reviewed and submitted for approval. JD 4.9.25 Added OECD 4.14.25, verified bed+ bath count, Added DRE Amt $0 (PO Amt $1883.25- Tenant Chg Back $0)-LN -Pending PO $6095 4.9.25 CO#1, G Munoz, submitted for approval $6095-CF 4.8.25 - Approved scope at $1,883.25. Pending roof replacement CO. LA 4.8.25- Disposition scope submitted for approval, RFS total: $1,883.25- CRM promoted to Inspection Reviewed status. JD 4.8.25 Dispo scope submitted for review $1883.25-CF 4.2.25 Added-RW LN 4.2.25 - Inspection needed. Budget is $8,000 for rehab to include: Exterior power wash, Landscape maintenance (trim tree branches growing into roof line), Fence gate repair (protruding screw), Fence picket repairs, Reinstall window screens, Full interior clean, Living room ceiling fan light not functional, HVAC service as needed.LASale PendingClinton FryJ F PRICE LLC
TX13360San Antonio8503 Silent CreekSan AntonioTXComplete Reviewed$36,7164/10/254/11/255/23/255/8/2527-1505.09.25 Added RFS Amt $36716.39 (PO Amt $37246.39 - Tenant Chg Back $530.00) -SJW 5.9.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.8.25 FW Passed, submitted for review-CF 5.7.25 - Approved CO4 at $200.LA 5.7.25 CO#4 Total $200.00 reviewed and submitted for approval. JD 5.7.25 CO#4-White Wing Const. submitted for approval $200-CF 4.30.25 Work complete- FW scheduled for 5/1-CF 4.30.25 Roof replacement today-CF 4.25.25 Added +17 days to ECD. LN 4.24.25 - Approved CO2 at $17,080. LA 4.24.25 CO #3 Total (NEG PO -$601.61) reviewed and approved for PO. JD 4.24.25-CO#3-ILG-submitted for approval ($601.61)-CF 4.24.25- CO #2 Total $17,080.00 reviewed and submitted for approval. JD 4.24.25 CO#2-G Munoz Ent- submitted for approval $17080.00-CF 4.22.25 Added +4 days to ECD LN 4.22.25 - Approved CO1 $4,413. LA 4.22.25- CO #1 Total $4,413.00 reviewed and submitted for approval. JD 4.22.25 CO#1, Air Perf Specialists, submitted for approval $4413.00-CF 4.21.25 Flooring to be installed today, Interior paint complete, Roof assessment requested-CF 4.16.25 Day 1 walk with GC-CF 4.14.25 Released POs to GC, promoted property to In Progress - LN 4.11.25 Added OECD 5.2.25, verified bed+ bath count, Added DRE Amt $16155 (PO Amt $16155- Tenant Chg Back $0)-LN 4.11.25 - Approved scope at $16,155. LA 4.11.25 Disposition scope submitted for approval, RFS total: $16,155.00- CRM promoted to Inspection Reviewed status. JD 4.10.25 Dispo scope submitted for review $16,255.00-CF 4.8.25 Added-RW LN 4.8.25 - Inspection needed. Budgeted $30,000 for rehab to include the following: Exterior power wash, Landscape Maintenance (trim bushes, remove weeds, refresh mulch at front, trim large trees, heavy overgrowth at backyard), Repair and paint any exterior wood rot around porch handrails and door trim, Replace carpet with new carpet due to staining in all bedrooms, stairs, loft, and dining room, Remove TV mount in living room, Full interior clean - Full interior paint, HVAC service as needed. LAListed For SaleClinton FryWHITE WING CONSTRUCTION SERVICES
TX13501San Antonio7906 Cortland OakSan AntonioTXComplete Reviewed$8,4064/22/254/22/255/2/255/1/259-16/12/20256/2/25 Updated RFS Amt $8405.72 ($8473.72-$68) JZ 5.2.25 Added RFS Amt $8473.72 (PO Amt $8473.72 - Tenant Chg Back $0) -LN 5.1.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.1.25 Final walk passed, submitted for review-CF 4.30.25 Roof replacement rescheduled for today-CF 4.28.25 Site visit-work near complete status-Roof replacement tomorrow -CF 4.25.25 CO #1 Total (neg PO -$210) , CO#2 Total $210.00- reviewed and approved for PO. JD 4.25.25 CO#1-Reign Const ($210) CO#2-Air Perf Specialists $210- submitted for approval-CF 4.25.25 Exterior work in progress-CF 4.23.25 Day 1 walk with GC-CF 4.22.25 Released POs to GC, promoted property to In Progress - LN 4.22.25 Added OECD 5.2.25 , verified bed+ bath count, Added DRE Amt $8473.72 (PO Amt $8473.72- Tenant Chg Back $0)-LN 4.22.25 - Approved scope at $8,473.72. LA 4.22.25-Disposition scope submitted for approval, RFS total: $8,473.72- CRM promoted to Inspection Reviewed status. JD 4.22.25 Dispo scope submitted for review $8473.72-CF 4.18.25 Added-RW LN 4.18.25 - Inspection needed. Notes: Mostly general cleaning & minor repairs needed. There is a good amount of cracking at interior wall and ceiling, exterior separation and erosion. Keep rehab to minimum. Budgeted $15,000 for rehab to include: Exterior power wash, Landscape maintenance (trim large tree at yard & side as they are growing/laying on the home, trim overgrown bushes, remove weeds, refresh mulch, backyard needs lawn mow) , Roof assessment (heavy damage, large amount of shingles laying in the yard), Fence on left side is fully leaning, secure, Full interior clean, Install missing light switch plate covers, Carpet clean stairs, Replace burnt/missing light bulbs, Mechanical closet on 2nd floors needs cleaning, HVAC service as needed.LASale PendingClinton FryREIGN CONSTRUCTION
TX15070San Antonio843 Magnolia MistSan AntonioTXComplete Reviewed$2,3514/3/254/4/254/11/254/10/256-15/4/25 Updated RFS Amt $ 4.29.25 Site Visit, home good and secure. 4/10/25 Added RFS Amt $3833 (PO Amt $3833 - Tenant Chg Back $0) -JZ 4.10.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.10.25 FW passed, submitted for review-CF 4.8.25 Paint Complet, Final Clean scheduled for 4/9-CF 4.6.25 Day 1 walk with GC -CF 4.4.25 Released POs to GC, promoted property to In Progress - LN 4.4.25 Added OECD 4.11.25 , verified bed+ bath count, Added DRE Amt $3833 (PO Amt $3833- Tenant Chg Back $0)-LN 4.4.25 - Approved scope at $3,833. LA 4.3.25-Disposition scope submitted for approval, RFS total: $3,833.00- CRM promoted to Inspection Reviewed status. JD 4.3.25 Dispo scope submitted for review $3,833.00-CF 4.2.25 Added-RW LN 4.2.25 - Inspection needed. Budget is $10,000 for rehab to include: Exterior power wash, Landscape Maintenance (trim bushes, remove debris, remove weeds), Front door paint/clean, Full interior clean, Drywall repairs (behind front entry door there is a hole), Add missing cover plates to outlets and light switches, Interior trash out (construction debris in garage), Full interior paint, Address any other safety hazards. LAListed For SaleClinton FryREIGN CONSTRUCTION
TX15833San Antonio24727 Bogey RidgeSan AntonioTXComplete Reviewed$23,6533/7/253/14/254/14/254/14/253106.6.25 Submit PO for DPCRCO #2. Updated RFS Amt $23653.05 ($26093.35 - $2440.30) LN 6.6.25 - CO2 approved at $375. LA 6.6.25- DPCRCO #2 Total $375.00- reviewed and submitted for approval. JD 6.6.25 DPCRCO#2-Reign Const, submitted for approval $375-CF 5.20.25- DPCRCO#1 reviewed complete and approved for payment. JD 5.19.25 DPCRCO#1, Reign Const, complete and approved for payment, inv attached, photos uploaded to RW-CF 5.15.25 Submit PO for DPCRCO #1. Updated RFS Amt $23278.05 ($25718.35 -$2440.30) LN 5.15.25-Approved CO1 at $150. LA 5.15.25-DPCRCO#1 total $150.00- reviewed and submitted for approval. JD 5.15.25 DPCRCO#1-Reign Const, submitted for approval $150-CF 5.5.25-Agent notified us that Friday night high winds knocked over a portion of the fence. Neighbor emailed us asking to share the cost. LA 04.15.25 Added RFS Amt $23128.05 (PO Amt $25568.35- Tenant Chg Back $2440.30) -SJW 4.15.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.14.25 FW Passed, submitted for review-CF 4.7.25-Approved CO2 at $300 and CO3 at $200. LA 4.7.25-CO #2 total $300, CO#3 total $200 reviewed and submitted for approval. JD 4.6.25 CO#3, Reign Const, submitted for approval $200-CF 4.6.25 CO#2, Air Perf Specialists, submitted for approval $300-CF 4.3.25 HVAC replacements complete-CF 3.31.25 Paint complete, HVAC discovered freon leak in wall. GC will make cut to allow repair access-CF 3.26.25 HVAC Replacements today-CF 3.25.25 Int paint near completion. Outside tree trimming complete-CF 3.21.25 All doors and trim paint complete. Upstairs paint near completion-CF 3.20.25 - Approved CO1 at $8,181. LA 3.20.25 CO #1 Total $8,181.00 reviewed and submitted for approval. JD 3.19.25 CO#1-Air Performance Specialists-submitted for approval $8,181.00-CF 3.18.25 Paint prep in progress, HVAC service complete, sent recommendations to RM-CF 3.14..25 Released POs to GC, promoted property to In Progress-LN 3.14.25 Added OECD 4.2.25, verified bed+ bath count, Added DRE Amt $16887.35(PO Amt $16887.35-Tenant Chg Back $0)-LN 3/14/25 TM-Scope approved-$16,887.35 3/14/25-Recommend proceeding with the revised scope $16,887.35 GH 3/12/25-Reviewed scope with PJ. Agreed to make some minor revisions.GH 3/11/25 Submitted scope to GH for review, RFS total: $17,505.92. PJ 3.11.25 Scope edits made. Disposition scope (Roman Fund) submitted for approval, RFS total: $17,505.92- CRM promoted to Inspection Reviewed status. JD 3/11/25 Reviewed scope with JD, talked through several items. PJ 3.10.25- Disposition scope(Roman Fund) submitted for approval, RFS total: $17,185.92- CRM promoted to Inspection Reviewed status. JD 3.10.25 Dispo scope submitted for review $17.233.92-CF 3.6.25 Added-RW LN ( previous notes removed and saved in Ebox) JDListed For SaleClinton FryREIGN CONSTRUCTION
TX16293San Antonio7614 Copper DawnConverseTXComplete Reviewed$04/3/254/4/254/9/254/9/25506.3.25 Adhoc inspection performed, hvac not cooling, will create CO-CF 04.10.25 RFS Amt $0 (PO Amt $1276.80 - Tenant Chg Back $1379.80) -SJW 4.10.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.9.25 FW passed, submitted for review-CF 4.8.25 Work complete, CO Trash out today-CF 4.8.25 - Approved CO1 at $450. LA 4.8.25 CO#1 Total $450 reviewed and submitted for approval. JD 4.7.25 CO#1, Reign Const. submitted for approval $450-CF 4.6.25 Day 1 walk with GC - CF 4.4.25 Released POs to GC, promoted property to In Progress - LN 4.4.25 Added OECD 4.9.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $826.80- Tenant Chg Back $1379.80)-LN 4.3.25 - Approved scope at $826.80. LA 4.3.25- Disposition scope submitted for approval, RFS total: $826.80- CRM promoted to Inspection Reviewed status. JD 4.3.25 Dispo scope submitted for review $826.80-CF 4.2.25 Added-RW MLD 4.2.25 - Inspection needed. Subject has significant foundation concerns. Driveway is separating from home, leaving a 5in gap. Settling cracks and erosion throughout. AS IS sale, requesting minor items to clean up with a $5,000 budget. Interior clean (mostly wipe down counters and sweep floors), Interior trash out (garage has trash), Torn out carpet in some remove, remove loose carpet, Address any other safety concerns. LAListed For SaleClinton FryREIGN CONSTRUCTION
TX16954San Antonio6748 Wayman RidgeSan AntonioTXComplete Reviewed$2,8131/7/251/8/251/13/251/13/25506/17/20252.26.25 Adhoc inspection performed-CF 2.7.25 DPCRCO #1 reviewed complete and approved for payment. JD 2.7.25 DPCRCO#1 JF Price, complete and approved for payment, invoice attached, photos uploaded to RW-CF 2.5.25 Site visit, Adhoc inspection performed-CF 1.30.25 Submit PO for DPCRCO #1. Updated RFS Amt $2812.60 ($2812.60-$0/tcb) LN 1.30.25 DPCRCO #1 Total $1,500.00 reviewed and submitted for approval. JD 1.30.25 DPCRCO#1-JF Price-submitted for approval $1500-CF 01.15.25 Added RFS Amt $1312.60 (PO Amt $1312.60 - Tenant Chg Back $0) -SJW 1.14.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 1.13.25 FW passed and submitted for review-CF 1.9.25 Day 1 walk with vendor-CF 1.8.25 Released POs to GC, promoted property to In Progress - LN 1.8.25 Added OECD 1.13.25 , verified bed+ bath count, Added DRE Amt $1312.60 (PO Amt $1312.60- Tenant Chg Back $0)-LN 1.8.25 - Approved scope at $1,312.60. LA 1.8.25-Disposition scope submitted for approval, RFS total: $1,312.60- CRM promoted to Inspection Reviewed status. JD 1.7.24 Dispo scope submitted for review $1,312.60-CF 1.6.25 Added-RW LN 1.6.25 - Inspection Needed. Note: There is obvious evidence of previous foundation work on the driveway and huge patch at interior garage floor. Let’s keep rehab to a minimum, address safety issues, cleaning, and we will sell AS IS. Budgeted $10,000 for rehab to include: • Exterior power wash • Front doorknob replacement (sticky, doesn’t work) • Full interior clean• HVAC service (agent noted the system was completely turned off.) • Reinstall all outlet cover plates. • Carpet is heavily stained throughout (Do you recommend we rip out and leave floors as is or replace with carpet?) • Trash out ripped out carpet/debris. • Remove plastic covers from light fixtures throughout. • Confirm if kitchen appliances work, if not, let’s trash out. No replacement. • Address any other safety concerns. LASale PendingClinton FryJ F PRICE LLC
TX17023San Antonio24615 Corral GablesSan AntonioTXComplete Reviewed$05/30/255/30/256/5/256/5/25606.6.25 (PO Amt $2968.16 – Accrued Prop Loss or squatter or hurricane) 6.6.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 6.5.25 FW Passed, submitted for review-CF 5.31.25 Day 1 walk with vendor-CF 5.30.25 Released POs to GC, promoted property to In Progress - LN 5.30.25 Added OECD 6.5.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $2968.16- Tenant Chg Back $0)-LN - $2968.16 Accrued Property Loss 5.30.25-Disposition scope submitted for approval, RFS total: $0.00; CO#1 Accrued Property Loss Total $2,968.16- CRM promoted to Inspection Approved status. JD 5.30.25 Disposition scope submitted for approval. CO#1-Accrued property loss-JF Price-submitted for approval $2968.16-CF 5.29.25 Added-RW LN 5.29.25 - Fire Home. Proceed with demo only, as we will list the home AS IS. LAValuationClinton FryJ F PRICE LLC
TX17050San Antonio3622 Mill Meadow DriveSan AntonioTXComplete Reviewed$3905/2/255/5/255/9/255/8/253-15.8.25 Added RFS Amt $389.57 (PO Amt $2011.78 - Tenant Chg Back $1622.21) -LN 5.8.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.8.25 FW Passed, submitted for review-CF 5.5.25 Released POs to GC, promoted property to In Progress - LN 5.5.25 Added OECD 5.9.25, verified bed+ bath count, Added DRE Amt $389.57 (PO Amt $2011.78- Tenant Chg Back $1622.21)-LN 5.5.25 - Approved scope at $2,011.78. LA 5/4/25 Disposition scope submitted for approval, RFS total: $2,011.78 CRM promoted to Inspection Reviewed status. PJ 5/4/25 Scope under review, notes sent to CF, scope to be submitted to analyst on 5/5. PJ 5.2.25 Dispo scope submitted for review $1781.78-CF 4.30.25 Added-RW LN 4.30.25 - Inspection needed. large investment into the home. Notes: Knowing that PM got a foundation inspection, we are going to lean towards AS IS. Address safety and cleaning items only. Budget is $10,000 for rehab to include: Exterior power wash ,Landscape maintenance (trim large tree at front away from home, trim bushes, remove weeds), Install ceiling vent in the living room (currently on the floor), Fence picket repairs. Full interior clean. Laundry room – assess water damage and confirm no active leaks. Bedroom 1 has potential active leak in the ceiling. Investigate and repair. LAListed For SaleClinton FryREIGN CONSTRUCTION
TX17080San Antonio8423 Timber MillSan AntonioTXComplete Reviewed$9355/27/255/28/256/4/256/4/25706.9.25- DPCRCO #1 Total $60.00 reviewed and submitted for approval. JD 6.9.25 DPCRCO#1, Air Perf Specialists, submitted for approval $60-CF 6.4.25 Added RFS Amt $934.67 (PO Amt $2420.20 - Tenant Chg Back $1485.53) - 6.4.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 6.4.25 FW passed, submitted for review-CF 6.2.25 Interior work complete, exterior work to start today-CF 5.30.25 Day 1 walk with vendor-CF 5.29.25 Released POs to GC, promoted property to In Progress - LN 5.28.25 Added OECD 6.4.25 , verified bed+ bath count, Added DRE Amt $2420.20 (PO Amt $2420.20- Tenant Chg Back $0)-LN 5.28.25 - Approved scope at $2.420.20. LA 5.28.25-Disposition scope submitted for approval, RFS total: $2,420.20- CRM promoted to Inspection Reviewed status. JD 5.28.25 Dispo scope submitted for review $2295.20-CF 5.27.25 Added-RW LN 5.27.25 - Inspection needed. Note: Keeping rehab light here due to age. Budgeted $5,000 for rehab to include: Exterior power wash, Landscape maintenance (clean up dead trees/debris, remove weeds, trim bushes/trees), Full interior clean, reinstall oven in kitchen, Interior trash out, Remove blue tape throughout, HVAC service as needed. LAListed For SaleClinton FryREIGN CONSTRUCTION
TX18079San Antonio9206 Laguna FallsSan AntonioTXComplete Reviewed$04/8/254/8/254/15/254/15/25706/12/20255.13.25 DERNCO #1 Reviewed complete and approved for payment. JD 5.12.25 DERNCO#1-GMunoz, complete and approved for payment at closing, invoice attached, photos uploaded to RW-CF 5.12.25 Replacement complete, waiting on completion docs-CF 5.9.25 Roof replacement still scheduled for today-CF 5.7.25 Roof replacement scheduled for 5/9-CF 5.6.25 Submit PO for DERNCO #1. No change to RFS Amt due to PO being paid at closing. LN 5.6.25 - Approved DERNCO 1 at $6,360. LA 5.6.25-DERNCO #1 Total $6,360.00-reviewe & submitted for approval. JD 5.6.25 DERNCO#1-GMunoz, submitted for approval $6360.00-CF 5.5.25 - Escrow Repair needed. Invoice to be paid at closing. Closing on 6/9/25. Seller to replace the roof with similar type by licensed professional. (Reference pages 11,12,13). LA 4.15.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.15.25 FW Passed, submitted for review-CF 4.14.25 Work complete, FW scheduled for 4/15-CF 4.9.25 Day 1 walk with GC-CF 4.8.25 Released POs to GC, promoted property to In Progress - LN 4.8.25 Added OECD 4.14.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $2959.20- Tenant Chg Back $3892.53)-LN 4.8.25 - Approved scope at $2,959.20. LA 4.8.25-Disposition scope submitted for approval, RFS total: $2,959.20- CRM promoted to Inspection Reviewed status. JD 4.8.25 Dispo scope submitted for review $2959.20-CF 4.3.25 Added-RW LN 4.3.25 - Inspection needed. Note: Agent mentioned evidence of previous foundation work. Let’s keep work to a minimum here, AS IS sale. Budgeted $5,000 for rehab to include: Exterior power wash, Landscape maintenance (refresh mulch, remove weeds and debris), Full interior clean, Address half bath leak under sink (Clint is already aware), Fence picket repair, Address any safety related issues. LASale PendingClinton FryJ F PRICE LLC
TX18378San Antonio3713 Candlecreek CourtSan AntonioTXComplete Reviewed$01/7/251/8/251/13/251/13/25502.26.25 Adhoc inspection performed-CF 2.5.25 Site visit, Adhoc inspection performed-CF 1.14.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 1.13.25 FW passed, submitted for review-CF 1.9.25 Day 1 walk with vendor-CF 1.8.25 Released POs to GC, promoted property to In Progress - LN 1.8.25 Added OECD 1.13.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $1180.47- Tenant Chg Back $5114.92)-LN 1.8.25 - Approved scope at $1,180.47. LA 1.8.25-Disposition scope submitted for approval, RFS total: $1,180.47- CRM promoted to Inspection Reviewed status. JD 1.7.25 Dispo scope submitted for review $1,195.48-CF 1.6.25 Added-RW LN 1.6.25 - Inspection needed. Note: Deep cracking at the driveway, possibly linked to foundation failure. Can’t see anything at interior to indicate a foundation issue. Please provide guidance on what you see regarding foundation. For now, keeping rehab to a minimum. Budgeted $5,000 for rehab to include: • Exterior power wash • Full interior clean • Replace burnt or missing light bulbs throughout. • Clean paint off LVP floors. • Reinstall bath fixtures. • HVAC service. LAListed For SaleClinton FryJ F PRICE LLC
TXA0589San Antonio9202 Mission BrookSan AntonioTXComplete Reviewed$04/29/254/30/255/7/255/6/256-15.7.25 Added RFS Amt $0 (PO Amt $1336.47 - Tenant Chg Back $1360) -LN 5.7.25- Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.6.25 FW Passed submitted for review-CF 5.5.25 Work complete, FW scheduled for 5/7-CF 4.30.25 Day 1 walk with GC-CF 4.30.25 Released POs to GC, promoted property to In Progress - LN 4.30.25 Added OECD 5.5.25, verified bed+ bath count, Added DRE Amt $1336.47 (PO Amt $1336.47- Tenant Chg Back $0)-LN 4.30.25 - Approved scope at $1,336.47. Foundation home per CM. LA 4.29.25- Disposition scope submitted for approval, RFS total: $1,336.47- CRM promoted to Inspection Reviewed status. JD 4.29.25 Dispo scope submitted for review $1,336.47-CF 4.28.25 Added-RW LN 4.28.25 - Inspection needed. Budget is $4,500 for rehab to include the following: • Exterior power wash •Landscape maintenance (refresh mulch, remove weeds, trim large tree branches that are starting to hang above roof) • Fence repairs (currently being held up by a wood post) • Full interior clean • HVAC service • Adjust garage door at interior, won’t close unless it’s locked. • Evaluate roof for repairs or replacement. • Address any other safety hazards. LAListed For SaleClinton FryREIGN CONSTRUCTION
TX18319San Antonio219 Cedron ChaseSan AntonioTXRent Ready5/30/256.2.25 Added Actual Rehab Amt $52552.38 to CRM - LN 5.30.25-Final Walk approved. RW closed, RVD set, and home promoted to RR. IRCP approved for payment. JD 5.30.25 FW passed, submitted for review-CF 5.29.25 Work complete, final clean in the evening. Final walk scheduled 5/30-CF 5.28.25- CO#4 total $1,245.00 CO#5 (NEG PO-$89.00) reviewed and approved for PO. JD 5.28.25 CO#4 JF Price $1245 CO#5 ILG (-$89) submitted for approval-CF 5.27.25 Countertop install today-CF 5.20.25 Cabinet delivery today-CF 5.15.25 Shoe mold installation today-CF 5.12.25 Interior fixtures being installed-CF 5.9.25 Flooring complete-CF 5.5.25 Flooring scheduled for 5/7-CF 4.30.25 Paint complete, Scheduling flooring-CF 4.23.25 Paint in progress-CF 4.21.25 CO#3 total $4,434.50-reveiwed & approved for PO. Repair cost greater than 50% to replace. JD 4.21.25 CO#3-Air Perf Specialists, submitted for approval $4,434.50-CF 4.21.25 Roof replacement complete, submitted options for HVAC repairs to CM-CF 4.18.25 CO#2 total (NEG PO -$648.03) -reviewed and approved for PO. JD 4.18.25 CO#2, ILG, submitted for approval ($648.03) -CF 4.16.25 Trash out and paint prep complete-CF 4.11.25 Appliances delivered-CF 4.10.25 Day 1 walk with GC-CF 4.9.25 Released POs to GC, promoted property to Under Construction - LN 4.9.25 Added ECD , uploaded scope, ordered appliances, pending ETL, verified bed/bath count – LN 4.8.25 Legacy scope approved for PO(S), IR total: $47,671.27 + CO#1 Turn $1,080.00. JD 4/8/25 Reviewed scope with JD, confirmed master bath could accommodate double vanity. PJ 4.8.25-Legacy Scope submitted to PJ for approval. IR total $47,671.27 + CO #1 Turn Total $1,080.00. JD 4.7.25 Revised scope submitted for review $47,671.27 + CO#1 Turn -$1080.00-CF 4.7.25-CM to make scope edits and re-submit. JD 4.7.25 Legacy scope submitted for review $48,785.65-CF 4.7.25 Stage 1 marketing complete-CF 4.4.25 Promoted property to OFB, Added-RW, assigned to Clint, pending scope approval for Legacy POs LN ARP PropertyRent ReadyClinton FryJ F Price Llc
TX21848San Antonio6112 Fred CouplesSchertzTXRent Ready5/14/255.14.25 Added Actual Rehab Amt $46637.19 to CRM - LN 5.14.25-Final Walk approved. RW closed, RVD set, and home promoted to RR. IRCP approved for payment. JD 5.13.25 Final Walk passed, submitted for review-CF 5.12.25 Co #5 total $480.00, CO#6 total $980.00 reviewed and approved for PO. JD 5.12.25 CO#5, ILG, submitted $480 & CO#6, JF Price, submitted $980-CF 5.7.25 Exterior paint and repairs in progress-CF 5.5.25 Flooring complete, cabinet scheduled for tomorrow-CF 5.1.25- CO#4 Total (NEG PO -$912.08) reviewed and approved for PO. JD 4.30.25 CO#4-ILG, submitted for approval (912.08)-CF 4.28.25- CO#3 total $150.00 reviewed and approved for PO. JD 4.28.25 CO#3, JF Price, submitted for approval $150-CF 4.28.25 Interior paint complete, floor and cabinet demo to start today-CF 4.23.25 HVAC work scheduled for today-CF 4.21.25 CO#1 Total $1,045.00 CO#2 total $250.00- reviewed and approved for PO(s). JD 4.21.25 CO#1, Air Perf Specialists $1045.00 & CO#2, Nova Pest Control $250.00- Submitted for approval-CF 4.18.25 HVAC Service complete-CF 4.17.25 Day 1 walk with GC-CF 4.15.25 Released POs to GC, promoted property to Under Construction - LN 4.15.25 - Added ECD , uploaded scope, ordered appliances, pending ETL, verified bed/bath count – LN 4.15.25- Legacy scope approved for PO(S), IR total: $25,159.22. JD 4.15.25 Revised legacy scope submitted for review $25159.22-CF 4.15.25- reviewed scope with CF, CM to make edits and re-submit. JD 4.15.25 Legacy scope submitted for review $23,368.43-CF 4.14.25 Stage one marketing complete-CF 4.11.25 Added-RW, assigned to Clint, pending scope approval for Legacy POs- LN 4/10/25 - Emmanuel R - Pending review and approval J&B - pending approval - pending exterior trim paint and interior paint ILG - pending approval - carpet replacement needed in bedrooms SPW - 30 min IHM - clean and check ECD neededRent ReadyClinton FryJ F Price Llc
TX22782San Antonio11919 Silver PassSan AntonioTXRent Ready5/1/255/1/25 Added Actual Rehab Amt $42191.99to CRM - IR-NC Processed invoices for payment - JZ 5.1.25-Final Walk approved. RW closed, RVD set, and home promoted to RR. IRCP approved for payment. JD 5.1.25 FW passed, submitted for review-CF 4.30.25 Work complete- FW scheduled for 5/1-CF 4.29.25- CO#6 total $262.50- reviewed and approved for PO. JD 4.29.25 CO#6-JF Price- submitted for approval $262.50-CF 4.28.25 Finishing up today, waiting on countertop for kitchen island-CF 4.25.25 Countertop install scheduled for today-CF 4.21.25 Cabinet install today and countertop measurement tomorrow-CF 4.18.25 Flooring complete-CF 4.17.25 Exterior work near completion-CF 4.15.25-CO#5-total $398.35-reveiwed and approved for PO. JD 4.15.25 CO#5, ILG, submitted for approval $398.35-CF 4.15.25- CO#4 Total $325.00 reviewed and approved for PO. JD 4.15.25 CO#4 JF Price, submitted for approval, $325-CF 4.14.25 Waiting on cabinet delivery and install-CF 4.8.25 Exterior work in progress-CF 4.6.25- Interior Paint complete- HVAC repairs complete-CF 4.1.25- CO #3 Total $1,180.00 reviewed and approved for PO. JD 4.1.25- CO #2 Total $375.00 reviewed and approved for PO. JD 4.1.25 CO#3, JF Price, submitted for approval $1,180-CF 4.1.25 CO#2, Air Perf Specialist, HVAC Repair, submitted for approval $375-CF 3.31.25 Int Paint near completion-CF 3.27.25 Paint prep in progress, appliances on site-CF 3..25.25 Stage one marketing performed-CF 3.25.25 Cabinet demo in progress-CF 3.21.25 Day 1 Walk-CF 3.20.25 Released POs to GC, promoted property to Under Construction - LN 3.20.25 Added ECD , uploaded scope, ordered appliances, pending ETL, verified bed/bath count – LN 3.20.25-Legacy scope approved for PO(S), IR total: $37,846.47 & CO #1 Turn- $1200.00 JD 3.19.25 Revised scope submitted for review $39,049.47-CF 3.19.25 Scope edits needed by CM. JD 3.19.25 Legacy scope submitted for review $38,115.28-CF 3.19.25 Stage one marketing unable to be completed without yard sign-CF 3.17.25 Promoted property to OFB, Added-RW, assigned to Clint pending scope approval for Legacy POs LNRent ReadyClinton FryJ F Price Llc
Property ID: TX12993
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $5,611
Initial Scope Performed Date: 5/5/25
Initial Scope Approved Date: 5/6/25
Estimated Completion Date: 5/16/25
Rehab Verification Date: 5/16/25
Rehab for Sale Days: 10
Rehab Verified to ECD Delta: 0
Construction Comments: 5.30.25- DPCRCO#1 reviewed complete and approved for payment. JD 5.30.25 DPCRCO#1, VMace, complete and approved for payment, invoice attached, photos uploaded to RW-CF 5.19.25 - Approved CO1 at $575. LA 5.19.25 Added RFS Amt $5611.23 (PO Amt $5611.23 - Tenant Chg Back $0) -LN 5.19.25 Submit PO for DPCRCO #1. Updated RFS Amt $5612.66 ($5612.66-$0) LN 5.19.25 DPCRCO #1 Total $575.00 reveiwed and approved for PO. JD 5.19.25-DPCRCO#1, VMace Construction, submitted for approval $575-CF 5.17.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.16.25 FW passed submitted for review-CF 5.15.25- CO#1 Total $400.00- reviewed and approved for PO. JD 5.15.25 CO#1, VMace Const, submitted for approval $400-CF 5.14.25 Work complete, shower valve CO created, will FW after scope inspections are done-CF 5.8.25 Day 1 walk with GC-CF 5.6.25 Released POs to GC, promoted property to In Progress - LN 5.6.25 Added OECD 5.14.25 , verified bed+ bath count, Added DRE Amt $4637.66 (PO Amt $4637.66- Tenant Chg Back $0)-LN 5.6.25 - Approved scope at $4,637.66. LA 5.6.25-Disposition scope submitted for approval, RFS total: $4,637.66- CRM promoted to Inspection Reviewed status. JD 5.5.25-Disposition scope submitted for approval Total $4637.66. RR 4.30.25 Added-RW LN 4.30.25 - Inspection needed. Notes: Minor rehab to get the home cleaned. I didn’t see anything major. Budget is $8,000 to include the following: • Exterior power wash • Landscape maintenance (trim large overgrown trees, clean up weeds at front, possibly add mulch) • Full interior clean. • Replace burnt light bulbs. • Exterior trash out • HVAC service. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: V-MACE CONSTRUCTION - V-MACE ENTERPRISES
Property ID: TX12996
Market: Austin
Renovation Status: Escrow Repairs Needed
Rehab for Sale: $7,087
Initial Scope Performed Date: 5/6/25
Initial Scope Approved Date: 5/6/25
Estimated Completion Date: 5/16/25
Rehab Verification Date: 5/16/25
Rehab for Sale Days: 10
Rehab Verified to ECD Delta: 0
Closing Date: 6/18/2025
Construction Comments: 6.9.25 Roof replacement complete, waiting on invoice from vendor-CF 6.3.25 Roof replacement scheduled for 6/5-CF 6.2.25 Submit PO for DERNCO #1. No change to RFS Amt due to PO being paid at closing. LN 6.2.25- Approved DERNCO 1 at $5,500. LA 6.2.25 DERNCO #1 Total $5,500.00 reviewed and submitted for approval. JD 6.1.25 DERNCO#1-GMunoz, submitted for approval $5500-CF 5.30.25 - Escrow repairs needed. Invoice to be paid at close. Closing on 6/18/25. Seller to replace the roof with architectural shingles by licensed/certified roofing contractor. New roof will need to be re-inspected by buyer’s inspector before closing. LA 5.19.25 Added RFS Amt $7086.69 (PO Amt $7644.25 - Tenant Chg Back $557.56) -LN 5.17.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.16.25 FW passed, submitted for review-CF 5.14.25 Work near completion, window install today-CF 5.8.25 Day 1 walk with GC-CF 5.6.25 Released POs to GC, promoted property to In Progress - LN 5.6.25 Added OECD 5.16.25 , verified bed+ bath count, Added DRE Amt $7086.69 (PO Amt $7644.25- Tenant Chg Back $557.56)-LN 5.6.25 - Approved scope at $7,644.25. LA 5.6.25-Disposition scope submitted for approval, RFS total: $7,644.25- CRM promoted to Inspection Reviewed status. JD 5.6.25-Disposition scope submitted for approval Total $7417.75. RR 5.5.25 Added-RW LN 5.4.25 - Inspection needed. Budget is $8,000 for rehab to include: Exterior power wash, Landscape maintenance (remove weeds, refresh mulch, remove vines off of home) , Full interior clean, Loft on 2nd floor has crack under window (per agent), Full interior paint, HVAC service. LA
Dispo Status: Sale Pending
Construction Manager: Clinton Fry
General Contractor: V-MACE CONSTRUCTION - V-MACE ENTERPRISES
Property ID: TX13170
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $5,761
Initial Scope Performed Date: 5/7/25
Initial Scope Approved Date: 5/7/25
Estimated Completion Date: 5/19/25
Rehab Verification Date: 5/19/25
Rehab for Sale Days: 12
Rehab Verified to ECD Delta: 0
Construction Comments: 5/20/25 Added RFS Amt $5760.98 (PO Amt $7350.58 - Tenant Chg Back $1589.60) -JZ 5.20.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.19.25 FW passed, submitted for review-CF 5.16.25 Confirmed work is complete, will final walk 5/19-CF 5.12.25 Paint in progress, garbage disposal delivered today-CF 5.8.25 Day 1 walk with GC-CF 5.7.25 Released POs to GC, promoted property to In Progress - LN 5.7.25 Added OECD 5.16.25, verified bed+ bath count, Added DRE Amt $5755.80 (PO Amt $7345.40- Tenant Chg Back $1589.60)-LN 5.7.25 - Approved scope at $7,345.40. LA 5.7.25-Disposition scope submitted for approval, RFS total: $7,345.40- CRM promoted to Inspection Reviewed status. JD 5.7.25-Disposition scope submitted for approval Total $7369.90. RR 5.5.25 Added-RW LN 5.4.25 - Inspection needed. Budget is $5,000 for rehab to include: Exterior power wash, Landscape maintenance (mow lawn, trim down bushes), Repair damaged exterior siding, Full interior clean, HVAC service. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: V-MACE CONSTRUCTION - V-MACE ENTERPRISES
Property ID: TX13543
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $0
Initial Scope Performed Date: 5/5/25
Initial Scope Approved Date: 5/6/25
Estimated Completion Date: 5/12/25
Rehab Verification Date: 5/12/25
Rehab for Sale Days: 6
Rehab Verified to ECD Delta: 0
Construction Comments: 5.13.25 Added RFS Amt $0 (PO Amt $2391.73 - Tenant Chg Back $4701.66) -LN 5.13.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.12.25 FW Passed, submitted for review-CF 5.9.25 Site visit, final clean and tub repair in progress-CF 5.7.25 Day 1 walk with GC-CF 5.6.25 Released POs to GC, promoted property to In Progress - LN 5.6.25 Added OECD 5.12.25, verified bed+ bath count, Added DRE Amt $0 (PO Amt $2391.73- Tenant Chg Back $4701.66)-LN Specialty Vendors Added 5.6.25 - Approved $2,391.79. LA 5.6.25-Disposition scope submitted for approval, RFS total: $2,391.73- CRM promoted to Inspection Reviewed status. JD 5.6.25 Dispo scope submitted for review $2,241.73-CF 4.30.25 Added-RW LN 4.30.25 - Inspection needed. Notes: Minor rehab to get the home cleaned. I didn’t see anything major. Budget is $5,000 to include the following: Exterior power wash, Landscape maintenance (trim bushes at front, remove weeds, refresh the mulch, Exterior trash out (roof debris, roof replacement in progress), Full interior clean, HVAC service, repair as needed. Clean out garage floors. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: REIGN CONSTRUCTION
Property ID: TX14027
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $0
Initial Scope Performed Date: 5/14/25
Initial Scope Approved Date: 5/15/25
Estimated Completion Date: 5/22/25
Rehab Verification Date: 5/22/25
Rehab for Sale Days: 7
Rehab Verified to ECD Delta: 0
Closing Date: 6/13/2025
Construction Comments: 5.23.25 Added RFS Amt $0 (PO Amt $2937.17 - Tenant Chg Back $5415.54) -LN 5.23.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.22.25 FW passed, submitted for review-CF 5.21.25 All work complete, will condense Final Walk days in Austin to 5/22-CF 5.20.25 HVAC Complete-CF 5.16.25 Day 1 walk with GC-CF 5.15.25 Released POs to GC, promoted property to In Progress - LN 5.15.25 Added OECD 5.21.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $2937.17- Tenant Chg Back $5415.54)-LN 5.15.25 - Approved scope at $2,877.17. LA 5.15.25- Disposition scope submitted for approval, RFS total: $2,877.17- CRM promoted to Inspection Reviewed status. JD 5.14.25 Dispo scope submitted for review $2877.17-CF 5.12.25 Added-RW LN 5.12.25 - Inspection needed. Note: There appears to be signs of shifting, cracks in the ceilings. Best to keep this to a minimal rehab for cleaning and safety hazards only. AS- IS sale. Budgeted $5,000 for rehab to include: • Exterior power wash • Landscape maintenance (mow lawn, trim trees at front, remove weeds) • Repair rotting fascia at front of home. • Interior trash out • Full interior clean. • Replace batteries in smoke detectors. • Reinstall doors that are removed from hinges. • HVAC service as needed. • Address any safety concerns.LA
Dispo Status: Sale Pending
Construction Manager: Clinton Fry
General Contractor: V-MACE CONSTRUCTION - V-MACE ENTERPRISES
Property ID: TX14687
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $3,201
Initial Scope Performed Date: 5/7/25
Initial Scope Approved Date: 5/7/25
Estimated Completion Date: 5/15/25
Rehab Verification Date: 5/15/25
Rehab for Sale Days: 8
Rehab Verified to ECD Delta: 0
Construction Comments: 5.30.25 5.16.25 Added RFS Amt $3200.66 (PO Amt $4025.66 - Tenant Chg Back $825) -LN 5.16.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.15.25 FW passed, submitted for review-CF 5.15.25 - Approved CO1 at $601. LA 5.15.25- CO#1 Total $601.00 reviewed and submitted for approval. JD 5.15.25 CO#1-VMace Const. submitted for approval $601-CF 5.14.25 Work nearly complete, Will perform final walk 5/15-CF 5.12.25 Site visit, work near completion-CF 5.9.25 Day 1 walk with GC-CF 5.7.25 Released POs to GC, promoted property to In Progress - LN 5.7.25 Added OECD 5.14.25 , verified bed+ bath count, Added DRE Amt $2599.66 (PO Amt $3424.66- Tenant Chg Back $825)-LN 5.7.25 - Approved scope at $3,424.66. LA 5.7.25-Disposition scope submitted for approval, RFS total: $3,424.66- CRM promoted to Inspection Reviewed status. JD 5.7.25-Disposition scope submitted for approval Total $3445.66. RR 5.5.25 Added-RW LN 5.4.25 - Inspection needed. Budget is $5,000 to include: Exterior power wash, Landscape maintenance (mow lawn, trim down bushes), Repair damaged exterior siding and around back door & window frames, Full interior clean, HVAC service. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: V-MACE CONSTRUCTION - V-MACE ENTERPRISES
Property ID: TX14888
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $0
Initial Scope Performed Date: 5/6/25
Initial Scope Approved Date: 5/7/25
Estimated Completion Date: 5/14/25
Rehab Verification Date: 5/14/25
Rehab for Sale Days: 7
Rehab Verified to ECD Delta: 0
Construction Comments: 5/15/25 Added RFS Amt $ (PO Amt $2199.90 - Tenant Chg Back $3339.96) -JZ 5.15.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.14.25 FW Passed, submitted for review-CF 5.14.25 Work complete, will FW when dispo inspections are done-CF 5.12.25 CM in area on 5.14 for final walk. JD 5.12.25 Work complete, FW scheduled for 5.14 due to travel restrictions-CF 5.9.25 Day 1 walk with GC-CF 5.7.25 Released POs to GC, promoted property to In Progress - LN 5.7.25 Added OECD 5.12.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $2199.90- Tenant Chg Back $3339.66)-LN 5.7.25- Approved scope at $2,199. LA 5.7.25-Disposition scope submitted for approval, RFS total: $2,199.00- CRM promoted to Inspection Reviewed status. JD 5.7.25-Disposition scope submitted for approval Total $2199.90. RR 5.6.25 Added-RW LN 5.4.25 - No full rehab or scope needed here as subject is in good shape at interior. Home does need some exterior work. Budget is $2,500 for exterior power wash, and heavy landscape maintenance (lawns need to be mowed at front and backyard, heavy trimming of bushes, remove weeds, and heavy landscape debris at backyard). LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: V-MACE CONSTRUCTION - V-MACE ENTERPRISES
Property ID: TX15570
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $6,675
Initial Scope Performed Date: 5/13/25
Initial Scope Approved Date: 5/14/25
Estimated Completion Date: 5/30/25
Rehab Verification Date: 5/30/25
Rehab for Sale Days: 16
Rehab Verified to ECD Delta: 0
Construction Comments: 05.30.25 Added RFS Amt $6675.35 (PO Amt $6715.35 - Tenant Chg Back $40.00) -SJW 5.30.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.30.25 FW passed, submitted for review-CF 5.29.25 HVAC co work complete, ready for final walk-CF 5.28.25 - Approved CO1 at $705.LA 5.28.25- CO#1 Total $705.00-reviewed and submitted for approval. JD 5.28.25 CO#1-Air Perf Specialists-submitted for approval $705-CF 5.27.25 HVAC leak at schraeder valve, repair scheduled for 5/30-CF 5.22.25 Discovered leak in the hot water line during final walk, GC to repair 5.23-CF 5.20.25 HVAC complete-CF 5.15.25 Day 1 walk with GC-CF 5/14/25 Released POs to GC, promoted property to In Progress - JZ 5.14.25 Added OECD 5.23.25 , verified bed+ bath count, Added DRE Amt $6010.35 (PO Amt $6010.35- Tenant Chg Back $0)-LN 5.14.25 - Approved scope at $6,010.35. LA 5.14.25- Disposition scope submitted for approval, RFS total: $6,010.35 CRM promoted to Inspection Reviewed status. JD 5.13.25 Dispo scope submitted for review $6010.35-CF 5.12.25 Added-RW LN 5.12.25 - Inspection needed. Budgeted $7,000 for rehab to include: • Exterior power wash • Landscape maintenance (trim bushes, refresh mulch) • Address wood rot at exterior roof line. • Full interior clean • HVAC service • Address water intrusion at backyard door exterior side baseboard/siding. • Address safety hazards. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: J F PRICE LLC
Property ID: TX15608
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $0
Initial Scope Performed Date: 5/29/25
Initial Scope Approved Date: 5/30/25
Estimated Completion Date: 6/9/25
Rehab Verification Date: 6/9/25
Rehab for Sale Days: 10
Rehab Verified to ECD Delta: 0
Construction Comments: 6.9.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 6.9.25 FW passed, submitted for review-CF 6.5.25 Work complete, FW 6/6-CF 6.2.25 Day 1 walk with vendor-CF 6.2.25 Released POs to GC, promoted property to In Progress - LN 6.2.25 Added OECD 6.9.25 verified bed+ bath count, Added DRE Amt $2727.90 (PO Amt $3726.40- Tenant Chg Back $998.50)-LN 5.30.25 - Approved scope at $3,726.40 LA 5.30.25-Disposition scope submitted for approval, RFS total: $3,726.40- CRM promoted to Inspection Reviewed status. JD 5.30.25 Dispo scope submitted for review $3,726.40-CF 5.28.25 Added-RW LN 5.28.25 - Inspection needed. Note: Reason for sale is partially due to foundation concerns. Keeping rehab light. Budgeted $5,000 to include Exterior power wash, Landscape maintenance (trim and refresh mulch), Roof assessment for repair/replacement, Replace damaged window screens, Full Interior clean, add any other safety related items.LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: REIGN CONSTRUCTION
Property ID: TX20886
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $6,672
Initial Scope Performed Date: 2/21/25
Initial Scope Approved Date: 2/22/25
Estimated Completion Date: 3/10/25
Rehab Verification Date: 3/5/25
Rehab for Sale Days: 11
Rehab Verified to ECD Delta: -5
Closing Date: 6/13/2025
Construction Comments: 03.05.25 Added RFS Amt $6672.46 (PO Amt $11195.42 - Tenant Chg Back $4522.96) -SJW 3.5.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 3.5.25 FW Passed, submitted for review-CF 3.4.25 - Approved CO1 at $400. LA 3.4.25 CO #1 Total $400 reviewed and submitted for approval. JD 3.4.25 Roof replacement scheduled for 3.5.25-CF 3.3.25 Added +7 days to ECD. LN 3.3.25-CO#2 Total $6,625.00 reviewed and submitted for approval. JD 3.3.25 CO#2, G Munoz Ent, submitted for approval $6625-CF 2.28.25 CO#1, VMace Const, submitted for approval $400-CF 2.27.25 Work in progress, hvac and cleaning scheduled for 2/28-CF 2.25.25 Day1 walk with vendor-CF 2.24.25 Released POs to GC, promoted property to In Progress - LN 2.24.25 Added OECD 3.3.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $4170.42- Tenant Chg Back $4522.96)-LN 2.22.25 - Approved scope at $4,420.42. LA 2.22.25 -Disposition scope submitted for approval, RFS total: $4,420.42- CRM promoted to Inspection Reviewed status. JD 2.21.25 Dispo scope submitted for review $4,420.42 2.20.25 Scope scheduled for 2.21-CF 2.19.25 Added-RW LN 2.19.25 - Inspection needed. Budgeted $10,000 for rehab to include: Exterior power wash, landscape maintenance (refresh mulch, trim down bushes, remove weeds), full interior clean, roof assessment (agent noted missing/raised shingles), repair/paint exterior rotted wood trim. LA
Dispo Status: Sale Pending
Construction Manager: Clinton Fry
General Contractor: V-MACE CONSTRUCTION - V-MACE ENTERPRISES
Property ID: TX21352
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $0
Initial Scope Performed Date: 4/30/25
Initial Scope Approved Date: 5/27/25
Estimated Completion Date: 6/2/25
Rehab Verification Date: 5/30/25
Rehab for Sale Days: 3
Rehab Verified to ECD Delta: -3
Construction Comments: 05.30.25 RFS Amt $0 (PO Amt $3150.00 - Tenant Chg Back $0) -SJW - (PO Amt $3150.00 – Accrued Prop Loss - SJW 5.30.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.30.25 FW complete and submitted for review-CF 5.27.25 Released POs to GC, promoted property to In Progress - LN 5.27.25 Added OECD 6.2.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $3150- Tenant Chg Back $)-LN Accrued Property Loss 5.27.25- CO #1 Accrued Property Loss Total $3,150.00 approved. JD 5.23.25- Disposition scope submitted for approval, RFS total: $0.00, CO#1 Accrued Property loss $3,150.00- CRM promoted to Inspection Reviewed status. JD 5.20.25 CO#1, Accrued Property Loss, White Wing, submitted for approval $3150-CF 5.14.25 Received demo bid $3,150.00-CF 5.14.25 Followed up with GC to obtain quotes-CF 5.9.25 GC waiting on structural roof quote-CF 5.6.25 Followed up with GC to obtain quote. Should receive information this week-CF 4.30.25 Photos submitted to RW- met with GC to go over trash out and build back quote-CF 4.29.25 Added-RW LN 4.28.25 - Build back estimate needed for fire damaged home. Subject suffered from fire damage primarily on the 2nd floor (lightening strike).
Dispo Status: Valuation
Construction Manager: Clinton Fry
General Contractor: WHITE WING CONSTRUCTION SERVICES
Property ID: TX21369
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $4,676
Initial Scope Performed Date: 3/27/25
Initial Scope Approved Date: 3/27/25
Estimated Completion Date: 4/4/25
Rehab Verification Date: 4/4/25
Rehab for Sale Days: 8
Rehab Verified to ECD Delta: 0
Construction Comments: 4/4/25 Added RFS Amt $4675.50 (PO Amt $4863.50 - Tenant Chg Back $188.00) -JZ 4.4.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.4.25 FW passed, submitted for review-CF 3.30.25 Day 1 walk with vendor-CF 3.27.25 Released POs to GC, promoted property to In Progress - LN 3.27.25 Added OECD 4.4.25, verified bed+ bath count, Added DRE Amt $4675.50 (PO Amt $4863.50- Tenant Chg Back $188)-LN 3.27.25 - Approved scope at $4,863.50. LA 3.27.25-Disposition scope submitted for approval, RFS total: $4,863.50- CRM promoted to Inspection Reviewed status. JD 3.27.25- Dispo scope submitted for review $4833.50-CF 3.26.25 Added-RW LN 3.26.25 - Inspection needed. Budgeted $6,500 for rehab to include • Front door paint • Exterior siding is pulling away from the home at the side. Repair. • Full interior clean (paint marks on LVP in closets and rooms) • Paint exterior side of backdoor to the backyard. • Replace rusted door knob at back patio door. • Paint stair walls due to mismatched paint. • Master bedroom ceiling fan is not working; however, lights work. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: V-MACE CONSTRUCTION - V-MACE ENTERPRISES
Property ID: TX21383
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $0
Initial Scope Performed Date: 3/28/25
Initial Scope Approved Date: 3/31/25
Estimated Completion Date: 4/4/25
Rehab Verification Date: 4/4/25
Rehab for Sale Days: 4
Rehab Verified to ECD Delta: 0
Construction Comments: 4/4/25 Added RFS Amt $0 (PO Amt $1372.15- Tenant Chg Back $1680)- JZ 4.4.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.4.25 FW passed, submitted for review-CF 4.1.25 Day 1 walk with vendor-CF 3.31.25 Released POs to GC, promoted property to In Progress - LN 3.31.25 Added OECD 4.4.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $1372.15- Tenant Chg Back $1680)-LN 3.31.25 - Approved scope at $1,372.15. LA 3.31.25-Disposition scope submitted for approval, RFS total: $1,372.15- CRM promoted to Inspection Reviewed status. JD 3.30.25 Dispo scope submitted for review $1372.15 -CF 3.26.25 Added-RW LN 3.26.25 - Inspection needed. Budgeted $3,500 for rehab to include: • Exterior power wash • Front door paint • Full interior clean • Repair top stair step transition piece • Add any other safety related items. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: REIGN CONSTRUCTION
Property ID: TX21391
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $5,680
Initial Scope Performed Date: 5/5/25
Initial Scope Approved Date: 5/6/25
Estimated Completion Date: 5/15/25
Rehab Verification Date: 5/15/25
Rehab for Sale Days: 9
Rehab Verified to ECD Delta: 0
Construction Comments: 5.16.25 Added RFS Amt $5679.90 (PO Amt $5685.90 - Tenant Chg Back $6) -LN 5.16.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.15.25 Final Walk passed, submitted for review-CF 5.14.25 Work complete, will FW after dispo inspections are done-CF 5.12.25 Paint complete, final clean 5.13-CF 5.9.25 Paint in progress-CF 5.7.25 Day 1 walk with GC-CF 5.6.25 Released POs to GC, promoted property to In Progress - LN 5.6.25 Added OECD 5.15.25 , verified bed+ bath count, Added DRE Amt $5685.90 (PO Amt $5685.90- Tenant Chg Back $0)-LN 5.6.25 - Approved scope at $5,685.95. LA 5.6.25-Disposition scope submitted for approval, RFS total: $5,685.90- CRM promoted to Inspection Reviewed status. JD 5.6.25 Dispo scope submitted for review $5,685.90-CF 4.28.25 Added-RW LN 4.280.25 - Inspection needed. Budget is $4,500 for rehab to include: Exterior power wash, Landscape maintenance (minor trimming of bushes at front, refresh landscape, mow and edge), Exterior trash out, Full interior clean. Paint patches in several bedrooms, can we paint corner to corner to match? Address any other safety concerns.LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: REIGN CONSTRUCTION
Property ID: TX21393
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $5,500
Initial Scope Performed Date: 4/30/25
Initial Scope Approved Date: 5/2/25
Estimated Completion Date: 5/14/25
Rehab Verification Date: 5/14/25
Rehab for Sale Days: 12
Rehab Verified to ECD Delta: 0
Construction Comments: 5/15/25 Added RFS Amt $5499.65 (PO Amt $5998.65 - Tenant Chg Back $499) -JZ 5.15.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.14.25 FW passed, submitted for review-CF 5.14.25 Work complete, will FW after dispo inspections are done-CF 5.12.25 Finishing remaining items and final clean today-CF 5.9.25 paint complete-CF 5.7.25 Day 1 walk with GC-CF 5.5.25 Released POs to GC, promoted property to In Progress - LN 5.2.25 Added OECD 5.14.25, verified bed+ bath count, Added DRE Amt $5998.65 (PO Amt $5998.65- Tenant Chg Back $0)-LN 5.2.25 - Approved scope at $5,998.65.LA 5.1.25- Disposition scope submitted for approval, RFS total: $5,998.65- CRM promoted to Inspection Reviewed status. JD 4.30.25 Dispo scope submitted for review $5998.65-CF 4.28.25 Added-RW LN 4.28.25 - Inspection needed. Budget is $2,500 for rehab to include: Exterior power wash, Landscape maintenance (minor trimming of bushes at front, refresh landscape, mow and edge), Full interior clean, Address any other safety concerns. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: V-MACE CONSTRUCTION - V-MACE ENTERPRISES
Property ID: TX21415
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $0
Initial Scope Performed Date: 3/28/25
Initial Scope Approved Date: 3/31/25
Estimated Completion Date: 4/4/25
Rehab Verification Date: 4/4/25
Rehab for Sale Days: 4
Rehab Verified to ECD Delta: 0
Construction Comments: 4/5/25 Added RFS Amt $ (PO Amt $1677.32 - Tenant Chg Back $3781.84) -JZ 4.5.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.4.25 FW passed, submitted for review-CF 4.1.25 Day 1 walk with vendor-CF 3.31.25 Released POs to GC, promoted property to In Progress - LN 3.31.25 Added OECD (4/4) , verified bed+ bath count, Added DRE Amt $0 (PO Amt $1,677.32 - Tenant Chg Back $3,781.84)-MLD 3.31.25 - Approved scope at $1,677.32. LA 3.31.25-Disposition scope submitted for approval, RFS total: $1,677.32- CRM promoted to Inspection Reviewed status. JD 3.30.25 Dispo scope submitted for review $1,677.32-CF 3.26.25 Added-RW LN 3.26.25 - Inspection needed. Budgeted $7,000 for rehab to include: • Exterior power wash (driveway stains) • Landscape maintenance (some dead plants at the front need replacement, remove weeds) • Full interior clean (paint marks on LVP floors throughout) • Poor shoe mold job in half bath, clean up. • Clean kitchen counters • Bedroom 1 upstairs flooring has gaps in between joints, repair as needed. • Master bathroom shower trim loose, attach. • Master bathroom LVP floor around toilet is damaged, agented soft spot on the floor due to possible leak. Investigate and repair as needed. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: REIGN CONSTRUCTION
Property ID: TX21436
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $2,545
Initial Scope Performed Date: 4/30/25
Initial Scope Approved Date: 5/2/25
Estimated Completion Date: 5/12/25
Rehab Verification Date: 5/12/25
Rehab for Sale Days: 10
Rehab Verified to ECD Delta: 0
Closing Date: 6/16/2025
Construction Comments: 5.13.25 Added RFS Amt $2545.11 (PO Amt $ 2806.27- Tenant Chg Back $261.16) -LN 5.13.25 Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.12.25 FW passed. submitted for review-CF 5.8.25 Appliances delivered-CF 5.6.25 Day 1 walk with GC-CF 5.5.25 Released POs to GC, promoted property to In Progress - LN 5.2.25 Added OECD 5.12.25 , verified bed+ bath count, Added DRE Amt $2508.74 (PO Amt $2769.90- Tenant Chg Back $261.16)-LN 5.2.25 - Approved scope at $2,769. LA 5.1.25-Disposition scope submitted for approval, RFS total: $2,769.90- CRM promoted to Inspection Reviewed status. JD 5.1.25 Revised scope submitted for review $2769.90-CF 4.30.25 Dispo scope submitted for review $2,749.90-CF 4.28.25 Added-RW LN 4.28.25 - Inspection needed. Note: Light clean up and repair here, not much needed. Budget is $3,500 for rehab to include: Exterior power wash, Landscape maintenance (minor trimming of bushes at front, refresh landscape, mow and edge), Address erosion at sides of the home, under AC unit pad, Full interior clean, Address any other safety concerns. LA
Dispo Status: Sale Pending
Construction Manager: Clinton Fry
General Contractor: V-MACE CONSTRUCTION - V-MACE ENTERPRISES
Property ID: TX21442
Market: Austin
Renovation Status: Complete Reviewed
Rehab for Sale: $1,499
Initial Scope Performed Date: 4/30/25
Initial Scope Approved Date: 5/2/25
Estimated Completion Date: 5/9/25
Rehab Verification Date: 5/9/25
Rehab for Sale Days: 7
Rehab Verified to ECD Delta: 0
Construction Comments: 5/11/25 Added RFS Amt $1798.70 (PO Amt $1498.70 - Tenant Chg Back $0) -JZ 5/9/25 Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.9.25 Final walk passed, submitted for review-CF 5.6.25 Day 1 walk with GC, Pest control scheduled for 5/7-CF 5.5.25 Released POs to GC, promoted property to In Progress - LN 5.2.25 Added OECD 5.9.25, verified bed+ bath count, Added DRE Amt $1498.70 (PO Amt $1498.70- Tenant Chg Back $0)-LN 5.2.25 - Approved scope at $1,498.70. LA 5.1.25-Disposition scope submitted for approval, RFS total: $1,498.70- CRM promoted to Inspection Reviewed status. JD 4.30.25 Revised scope submitted for review $1498.70-CF 4.30.25 Dispo scope submitted for review $1438.70-CF 4.28.25 Added-RW LN 4.28.25 - Inspection needed. Note: Light clean up here, not much needed. Budget is $2,500 for rehab to include: Exterior power wash, Landscape maintenance (minor trimming of bushes at front, refresh landscape, mow and edge), Full interior clean, Address any other safety concerns. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: REIGN CONSTRUCTION
Property ID: TX12250
Market: San Antonio
Renovation Status: Complete Reviewed
Rehab for Sale: $42
Initial Scope Performed Date: 5/6/25
Initial Scope Approved Date: 5/12/25
Estimated Completion Date: 5/19/25
Rehab Verification Date: 5/19/25
Rehab for Sale Days: 7
Rehab Verified to ECD Delta: 0
Construction Comments: 5/20/25 Added RFS Amt $41.64 (PO Amt $3011.88 - Tenant Chg Back $2970.24) -JZ 5.20.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.19.25 FW Passed, submitted for review-CF 5.16.25 Final clean today-CF 5.13.25 Day 1 Walk with GC-CF 5.12.25 Released POs to GC, promoted property to In Progress - LN 5.12.25 Added OECD 5.19.25 , verified bed+ bath count, Added DRE Amt $41.64 (PO Amt $3011.88- Tenant Chg Back $2970.24)-LN 5.12.25 - Approved scope at $3,011.88. LA 5.12.25- Revised scope for as-is items only- Disposition scope submitted for approval, RFS total: $3,011.88- CRM promoted to Inspection Reviewed status. JD 5.12.25 Revised scope to reflect as-is items only, submitted for approval $4307.82-CF 5.7.25-Disposition scope submitted for approval, RFS total: $17,819.76- CRM promoted to Inspection Reviewed status. JD 5.7.25- CM to make edits and resubmit. JD 5.6.25 Dispo scope submitted for review $18,414.76-CF 5.5.25 Added-RW LN 5.4.25 - Inspection needed. Budget is $20K for rehab to include: • Exterior power wash • Exterior trash out (heavy fence debris at side of the home and backyard) • Landscape maintenance ( overgrown lawns need to be mowed, remove weeds, trim tree at front) • Full interior deep clean • Full interior paint (strong animal smell) • Agent reported active German cockroach infestation • Replace carpet at staircase, hallways, bedrooms, and loft on 2nd floor. • Drywall repairs • Full interior clean • Reinstall kitchen appliances • Repair kitchen cabinet drawers with missing covers. • Reinstall bathroom drawers • Replace missing light bulbs/smoke detector batteries. • HVAC service. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: J F PRICE LLC
Property ID: TX12868
Market: San Antonio
Renovation Status: Complete Reviewed
Rehab for Sale: $4,912
Initial Scope Performed Date: 4/8/25
Initial Scope Approved Date: 4/9/25
Estimated Completion Date: 4/21/25
Rehab Verification Date: 4/18/25
Rehab for Sale Days: 9
Rehab Verified to ECD Delta: -3
Closing Date: 6/24/2025
Construction Comments: 4/18/25 Added RFS Amt $4912.10 (PO Amt $7978.25 - Tenant Chg Back $3066.15) -JZ 4..18.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.18.25 FW Passed, submitted for review-CF 4.17.25 Roof replacement complete-CF 4/15/25 processed CO 1 added 6 days to ECD. JZ 4.14.25 Roof replacement scheduled for 4/16-CF 4.9.25 - Approved CO1 at $6,095. LA 4.9.25 Released POs to GC, promoted property to In Progress - LN 4.9.25- CO #1 Total $6,095 reviewed and submitted for approval. JD 4.9.25 Added OECD 4.14.25, verified bed+ bath count, Added DRE Amt $0 (PO Amt $1883.25- Tenant Chg Back $0)-LN -Pending PO $6095 4.9.25 CO#1, G Munoz, submitted for approval $6095-CF 4.8.25 - Approved scope at $1,883.25. Pending roof replacement CO. LA 4.8.25- Disposition scope submitted for approval, RFS total: $1,883.25- CRM promoted to Inspection Reviewed status. JD 4.8.25 Dispo scope submitted for review $1883.25-CF 4.2.25 Added-RW LN 4.2.25 - Inspection needed. Budget is $8,000 for rehab to include: Exterior power wash, Landscape maintenance (trim tree branches growing into roof line), Fence gate repair (protruding screw), Fence picket repairs, Reinstall window screens, Full interior clean, Living room ceiling fan light not functional, HVAC service as needed.LA
Dispo Status: Sale Pending
Construction Manager: Clinton Fry
General Contractor: J F PRICE LLC
Property ID: TX13360
Market: San Antonio
Renovation Status: Complete Reviewed
Rehab for Sale: $36,716
Initial Scope Performed Date: 4/10/25
Initial Scope Approved Date: 4/11/25
Estimated Completion Date: 5/23/25
Rehab Verification Date: 5/8/25
Rehab for Sale Days: 27
Rehab Verified to ECD Delta: -15
Construction Comments: 05.09.25 Added RFS Amt $36716.39 (PO Amt $37246.39 - Tenant Chg Back $530.00) -SJW 5.9.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.8.25 FW Passed, submitted for review-CF 5.7.25 - Approved CO4 at $200.LA 5.7.25 CO#4 Total $200.00 reviewed and submitted for approval. JD 5.7.25 CO#4-White Wing Const. submitted for approval $200-CF 4.30.25 Work complete- FW scheduled for 5/1-CF 4.30.25 Roof replacement today-CF 4.25.25 Added +17 days to ECD. LN 4.24.25 - Approved CO2 at $17,080. LA 4.24.25 CO #3 Total (NEG PO -$601.61) reviewed and approved for PO. JD 4.24.25-CO#3-ILG-submitted for approval ($601.61)-CF 4.24.25- CO #2 Total $17,080.00 reviewed and submitted for approval. JD 4.24.25 CO#2-G Munoz Ent- submitted for approval $17080.00-CF 4.22.25 Added +4 days to ECD LN 4.22.25 - Approved CO1 $4,413. LA 4.22.25- CO #1 Total $4,413.00 reviewed and submitted for approval. JD 4.22.25 CO#1, Air Perf Specialists, submitted for approval $4413.00-CF 4.21.25 Flooring to be installed today, Interior paint complete, Roof assessment requested-CF 4.16.25 Day 1 walk with GC-CF 4.14.25 Released POs to GC, promoted property to In Progress - LN 4.11.25 Added OECD 5.2.25, verified bed+ bath count, Added DRE Amt $16155 (PO Amt $16155- Tenant Chg Back $0)-LN 4.11.25 - Approved scope at $16,155. LA 4.11.25 Disposition scope submitted for approval, RFS total: $16,155.00- CRM promoted to Inspection Reviewed status. JD 4.10.25 Dispo scope submitted for review $16,255.00-CF 4.8.25 Added-RW LN 4.8.25 - Inspection needed. Budgeted $30,000 for rehab to include the following: Exterior power wash, Landscape Maintenance (trim bushes, remove weeds, refresh mulch at front, trim large trees, heavy overgrowth at backyard), Repair and paint any exterior wood rot around porch handrails and door trim, Replace carpet with new carpet due to staining in all bedrooms, stairs, loft, and dining room, Remove TV mount in living room, Full interior clean - Full interior paint, HVAC service as needed. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: WHITE WING CONSTRUCTION SERVICES
Property ID: TX13501
Market: San Antonio
Renovation Status: Complete Reviewed
Rehab for Sale: $8,406
Initial Scope Performed Date: 4/22/25
Initial Scope Approved Date: 4/22/25
Estimated Completion Date: 5/2/25
Rehab Verification Date: 5/1/25
Rehab for Sale Days: 9
Rehab Verified to ECD Delta: -1
Closing Date: 6/12/2025
Construction Comments: 6/2/25 Updated RFS Amt $8405.72 ($8473.72-$68) JZ 5.2.25 Added RFS Amt $8473.72 (PO Amt $8473.72 - Tenant Chg Back $0) -LN 5.1.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.1.25 Final walk passed, submitted for review-CF 4.30.25 Roof replacement rescheduled for today-CF 4.28.25 Site visit-work near complete status-Roof replacement tomorrow -CF 4.25.25 CO #1 Total (neg PO -$210) , CO#2 Total $210.00- reviewed and approved for PO. JD 4.25.25 CO#1-Reign Const ($210) CO#2-Air Perf Specialists $210- submitted for approval-CF 4.25.25 Exterior work in progress-CF 4.23.25 Day 1 walk with GC-CF 4.22.25 Released POs to GC, promoted property to In Progress - LN 4.22.25 Added OECD 5.2.25 , verified bed+ bath count, Added DRE Amt $8473.72 (PO Amt $8473.72- Tenant Chg Back $0)-LN 4.22.25 - Approved scope at $8,473.72. LA 4.22.25-Disposition scope submitted for approval, RFS total: $8,473.72- CRM promoted to Inspection Reviewed status. JD 4.22.25 Dispo scope submitted for review $8473.72-CF 4.18.25 Added-RW LN 4.18.25 - Inspection needed. Notes: Mostly general cleaning & minor repairs needed. There is a good amount of cracking at interior wall and ceiling, exterior separation and erosion. Keep rehab to minimum. Budgeted $15,000 for rehab to include: Exterior power wash, Landscape maintenance (trim large tree at yard & side as they are growing/laying on the home, trim overgrown bushes, remove weeds, refresh mulch, backyard needs lawn mow) , Roof assessment (heavy damage, large amount of shingles laying in the yard), Fence on left side is fully leaning, secure, Full interior clean, Install missing light switch plate covers, Carpet clean stairs, Replace burnt/missing light bulbs, Mechanical closet on 2nd floors needs cleaning, HVAC service as needed.LA
Dispo Status: Sale Pending
Construction Manager: Clinton Fry
General Contractor: REIGN CONSTRUCTION
Property ID: TX15070
Market: San Antonio
Renovation Status: Complete Reviewed
Rehab for Sale: $2,351
Initial Scope Performed Date: 4/3/25
Initial Scope Approved Date: 4/4/25
Estimated Completion Date: 4/11/25
Rehab Verification Date: 4/10/25
Rehab for Sale Days: 6
Rehab Verified to ECD Delta: -1
Construction Comments: 5/4/25 Updated RFS Amt $ 4.29.25 Site Visit, home good and secure. 4/10/25 Added RFS Amt $3833 (PO Amt $3833 - Tenant Chg Back $0) -JZ 4.10.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.10.25 FW passed, submitted for review-CF 4.8.25 Paint Complet, Final Clean scheduled for 4/9-CF 4.6.25 Day 1 walk with GC -CF 4.4.25 Released POs to GC, promoted property to In Progress - LN 4.4.25 Added OECD 4.11.25 , verified bed+ bath count, Added DRE Amt $3833 (PO Amt $3833- Tenant Chg Back $0)-LN 4.4.25 - Approved scope at $3,833. LA 4.3.25-Disposition scope submitted for approval, RFS total: $3,833.00- CRM promoted to Inspection Reviewed status. JD 4.3.25 Dispo scope submitted for review $3,833.00-CF 4.2.25 Added-RW LN 4.2.25 - Inspection needed. Budget is $10,000 for rehab to include: Exterior power wash, Landscape Maintenance (trim bushes, remove debris, remove weeds), Front door paint/clean, Full interior clean, Drywall repairs (behind front entry door there is a hole), Add missing cover plates to outlets and light switches, Interior trash out (construction debris in garage), Full interior paint, Address any other safety hazards. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: REIGN CONSTRUCTION
Property ID: TX15833
Market: San Antonio
Renovation Status: Complete Reviewed
Rehab for Sale: $23,653
Initial Scope Performed Date: 3/7/25
Initial Scope Approved Date: 3/14/25
Estimated Completion Date: 4/14/25
Rehab Verification Date: 4/14/25
Rehab for Sale Days: 31
Rehab Verified to ECD Delta: 0
Construction Comments: 6.6.25 Submit PO for DPCRCO #2. Updated RFS Amt $23653.05 ($26093.35 - $2440.30) LN 6.6.25 - CO2 approved at $375. LA 6.6.25- DPCRCO #2 Total $375.00- reviewed and submitted for approval. JD 6.6.25 DPCRCO#2-Reign Const, submitted for approval $375-CF 5.20.25- DPCRCO#1 reviewed complete and approved for payment. JD 5.19.25 DPCRCO#1, Reign Const, complete and approved for payment, inv attached, photos uploaded to RW-CF 5.15.25 Submit PO for DPCRCO #1. Updated RFS Amt $23278.05 ($25718.35 -$2440.30) LN 5.15.25-Approved CO1 at $150. LA 5.15.25-DPCRCO#1 total $150.00- reviewed and submitted for approval. JD 5.15.25 DPCRCO#1-Reign Const, submitted for approval $150-CF 5.5.25-Agent notified us that Friday night high winds knocked over a portion of the fence. Neighbor emailed us asking to share the cost. LA 04.15.25 Added RFS Amt $23128.05 (PO Amt $25568.35- Tenant Chg Back $2440.30) -SJW 4.15.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.14.25 FW Passed, submitted for review-CF 4.7.25-Approved CO2 at $300 and CO3 at $200. LA 4.7.25-CO #2 total $300, CO#3 total $200 reviewed and submitted for approval. JD 4.6.25 CO#3, Reign Const, submitted for approval $200-CF 4.6.25 CO#2, Air Perf Specialists, submitted for approval $300-CF 4.3.25 HVAC replacements complete-CF 3.31.25 Paint complete, HVAC discovered freon leak in wall. GC will make cut to allow repair access-CF 3.26.25 HVAC Replacements today-CF 3.25.25 Int paint near completion. Outside tree trimming complete-CF 3.21.25 All doors and trim paint complete. Upstairs paint near completion-CF 3.20.25 - Approved CO1 at $8,181. LA 3.20.25 CO #1 Total $8,181.00 reviewed and submitted for approval. JD 3.19.25 CO#1-Air Performance Specialists-submitted for approval $8,181.00-CF 3.18.25 Paint prep in progress, HVAC service complete, sent recommendations to RM-CF 3.14..25 Released POs to GC, promoted property to In Progress-LN 3.14.25 Added OECD 4.2.25, verified bed+ bath count, Added DRE Amt $16887.35(PO Amt $16887.35-Tenant Chg Back $0)-LN 3/14/25 TM-Scope approved-$16,887.35 3/14/25-Recommend proceeding with the revised scope $16,887.35 GH 3/12/25-Reviewed scope with PJ. Agreed to make some minor revisions.GH 3/11/25 Submitted scope to GH for review, RFS total: $17,505.92. PJ 3.11.25 Scope edits made. Disposition scope (Roman Fund) submitted for approval, RFS total: $17,505.92- CRM promoted to Inspection Reviewed status. JD 3/11/25 Reviewed scope with JD, talked through several items. PJ 3.10.25- Disposition scope(Roman Fund) submitted for approval, RFS total: $17,185.92- CRM promoted to Inspection Reviewed status. JD 3.10.25 Dispo scope submitted for review $17.233.92-CF 3.6.25 Added-RW LN ( previous notes removed and saved in Ebox) JD
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: REIGN CONSTRUCTION
Property ID: TX16293
Market: San Antonio
Renovation Status: Complete Reviewed
Rehab for Sale: $0
Initial Scope Performed Date: 4/3/25
Initial Scope Approved Date: 4/4/25
Estimated Completion Date: 4/9/25
Rehab Verification Date: 4/9/25
Rehab for Sale Days: 5
Rehab Verified to ECD Delta: 0
Construction Comments: 6.3.25 Adhoc inspection performed, hvac not cooling, will create CO-CF 04.10.25 RFS Amt $0 (PO Amt $1276.80 - Tenant Chg Back $1379.80) -SJW 4.10.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.9.25 FW passed, submitted for review-CF 4.8.25 Work complete, CO Trash out today-CF 4.8.25 - Approved CO1 at $450. LA 4.8.25 CO#1 Total $450 reviewed and submitted for approval. JD 4.7.25 CO#1, Reign Const. submitted for approval $450-CF 4.6.25 Day 1 walk with GC - CF 4.4.25 Released POs to GC, promoted property to In Progress - LN 4.4.25 Added OECD 4.9.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $826.80- Tenant Chg Back $1379.80)-LN 4.3.25 - Approved scope at $826.80. LA 4.3.25- Disposition scope submitted for approval, RFS total: $826.80- CRM promoted to Inspection Reviewed status. JD 4.3.25 Dispo scope submitted for review $826.80-CF 4.2.25 Added-RW MLD 4.2.25 - Inspection needed. Subject has significant foundation concerns. Driveway is separating from home, leaving a 5in gap. Settling cracks and erosion throughout. AS IS sale, requesting minor items to clean up with a $5,000 budget. Interior clean (mostly wipe down counters and sweep floors), Interior trash out (garage has trash), Torn out carpet in some remove, remove loose carpet, Address any other safety concerns. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: REIGN CONSTRUCTION
Property ID: TX16954
Market: San Antonio
Renovation Status: Complete Reviewed
Rehab for Sale: $2,813
Initial Scope Performed Date: 1/7/25
Initial Scope Approved Date: 1/8/25
Estimated Completion Date: 1/13/25
Rehab Verification Date: 1/13/25
Rehab for Sale Days: 5
Rehab Verified to ECD Delta: 0
Closing Date: 6/17/2025
Construction Comments: 2.26.25 Adhoc inspection performed-CF 2.7.25 DPCRCO #1 reviewed complete and approved for payment. JD 2.7.25 DPCRCO#1 JF Price, complete and approved for payment, invoice attached, photos uploaded to RW-CF 2.5.25 Site visit, Adhoc inspection performed-CF 1.30.25 Submit PO for DPCRCO #1. Updated RFS Amt $2812.60 ($2812.60-$0/tcb) LN 1.30.25 DPCRCO #1 Total $1,500.00 reviewed and submitted for approval. JD 1.30.25 DPCRCO#1-JF Price-submitted for approval $1500-CF 01.15.25 Added RFS Amt $1312.60 (PO Amt $1312.60 - Tenant Chg Back $0) -SJW 1.14.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 1.13.25 FW passed and submitted for review-CF 1.9.25 Day 1 walk with vendor-CF 1.8.25 Released POs to GC, promoted property to In Progress - LN 1.8.25 Added OECD 1.13.25 , verified bed+ bath count, Added DRE Amt $1312.60 (PO Amt $1312.60- Tenant Chg Back $0)-LN 1.8.25 - Approved scope at $1,312.60. LA 1.8.25-Disposition scope submitted for approval, RFS total: $1,312.60- CRM promoted to Inspection Reviewed status. JD 1.7.24 Dispo scope submitted for review $1,312.60-CF 1.6.25 Added-RW LN 1.6.25 - Inspection Needed. Note: There is obvious evidence of previous foundation work on the driveway and huge patch at interior garage floor. Let’s keep rehab to a minimum, address safety issues, cleaning, and we will sell AS IS. Budgeted $10,000 for rehab to include: • Exterior power wash • Front doorknob replacement (sticky, doesn’t work) • Full interior clean• HVAC service (agent noted the system was completely turned off.) • Reinstall all outlet cover plates. • Carpet is heavily stained throughout (Do you recommend we rip out and leave floors as is or replace with carpet?) • Trash out ripped out carpet/debris. • Remove plastic covers from light fixtures throughout. • Confirm if kitchen appliances work, if not, let’s trash out. No replacement. • Address any other safety concerns. LA
Dispo Status: Sale Pending
Construction Manager: Clinton Fry
General Contractor: J F PRICE LLC
Property ID: TX17023
Market: San Antonio
Renovation Status: Complete Reviewed
Rehab for Sale: $0
Initial Scope Performed Date: 5/30/25
Initial Scope Approved Date: 5/30/25
Estimated Completion Date: 6/5/25
Rehab Verification Date: 6/5/25
Rehab for Sale Days: 6
Rehab Verified to ECD Delta: 0
Construction Comments: 6.6.25 (PO Amt $2968.16 – Accrued Prop Loss or squatter or hurricane) 6.6.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 6.5.25 FW Passed, submitted for review-CF 5.31.25 Day 1 walk with vendor-CF 5.30.25 Released POs to GC, promoted property to In Progress - LN 5.30.25 Added OECD 6.5.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $2968.16- Tenant Chg Back $0)-LN - $2968.16 Accrued Property Loss 5.30.25-Disposition scope submitted for approval, RFS total: $0.00; CO#1 Accrued Property Loss Total $2,968.16- CRM promoted to Inspection Approved status. JD 5.30.25 Disposition scope submitted for approval. CO#1-Accrued property loss-JF Price-submitted for approval $2968.16-CF 5.29.25 Added-RW LN 5.29.25 - Fire Home. Proceed with demo only, as we will list the home AS IS. LA
Dispo Status: Valuation
Construction Manager: Clinton Fry
General Contractor: J F PRICE LLC
Property ID: TX17050
Market: San Antonio
Renovation Status: Complete Reviewed
Rehab for Sale: $390
Initial Scope Performed Date: 5/2/25
Initial Scope Approved Date: 5/5/25
Estimated Completion Date: 5/9/25
Rehab Verification Date: 5/8/25
Rehab for Sale Days: 3
Rehab Verified to ECD Delta: -1
Construction Comments: 5.8.25 Added RFS Amt $389.57 (PO Amt $2011.78 - Tenant Chg Back $1622.21) -LN 5.8.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.8.25 FW Passed, submitted for review-CF 5.5.25 Released POs to GC, promoted property to In Progress - LN 5.5.25 Added OECD 5.9.25, verified bed+ bath count, Added DRE Amt $389.57 (PO Amt $2011.78- Tenant Chg Back $1622.21)-LN 5.5.25 - Approved scope at $2,011.78. LA 5/4/25 Disposition scope submitted for approval, RFS total: $2,011.78 CRM promoted to Inspection Reviewed status. PJ 5/4/25 Scope under review, notes sent to CF, scope to be submitted to analyst on 5/5. PJ 5.2.25 Dispo scope submitted for review $1781.78-CF 4.30.25 Added-RW LN 4.30.25 - Inspection needed. large investment into the home. Notes: Knowing that PM got a foundation inspection, we are going to lean towards AS IS. Address safety and cleaning items only. Budget is $10,000 for rehab to include: Exterior power wash ,Landscape maintenance (trim large tree at front away from home, trim bushes, remove weeds), Install ceiling vent in the living room (currently on the floor), Fence picket repairs. Full interior clean. Laundry room – assess water damage and confirm no active leaks. Bedroom 1 has potential active leak in the ceiling. Investigate and repair. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: REIGN CONSTRUCTION
Property ID: TX17080
Market: San Antonio
Renovation Status: Complete Reviewed
Rehab for Sale: $935
Initial Scope Performed Date: 5/27/25
Initial Scope Approved Date: 5/28/25
Estimated Completion Date: 6/4/25
Rehab Verification Date: 6/4/25
Rehab for Sale Days: 7
Rehab Verified to ECD Delta: 0
Construction Comments: 6.9.25- DPCRCO #1 Total $60.00 reviewed and submitted for approval. JD 6.9.25 DPCRCO#1, Air Perf Specialists, submitted for approval $60-CF 6.4.25 Added RFS Amt $934.67 (PO Amt $2420.20 - Tenant Chg Back $1485.53) - 6.4.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 6.4.25 FW passed, submitted for review-CF 6.2.25 Interior work complete, exterior work to start today-CF 5.30.25 Day 1 walk with vendor-CF 5.29.25 Released POs to GC, promoted property to In Progress - LN 5.28.25 Added OECD 6.4.25 , verified bed+ bath count, Added DRE Amt $2420.20 (PO Amt $2420.20- Tenant Chg Back $0)-LN 5.28.25 - Approved scope at $2.420.20. LA 5.28.25-Disposition scope submitted for approval, RFS total: $2,420.20- CRM promoted to Inspection Reviewed status. JD 5.28.25 Dispo scope submitted for review $2295.20-CF 5.27.25 Added-RW LN 5.27.25 - Inspection needed. Note: Keeping rehab light here due to age. Budgeted $5,000 for rehab to include: Exterior power wash, Landscape maintenance (clean up dead trees/debris, remove weeds, trim bushes/trees), Full interior clean, reinstall oven in kitchen, Interior trash out, Remove blue tape throughout, HVAC service as needed. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: REIGN CONSTRUCTION
Property ID: TX18079
Market: San Antonio
Renovation Status: Complete Reviewed
Rehab for Sale: $0
Initial Scope Performed Date: 4/8/25
Initial Scope Approved Date: 4/8/25
Estimated Completion Date: 4/15/25
Rehab Verification Date: 4/15/25
Rehab for Sale Days: 7
Rehab Verified to ECD Delta: 0
Closing Date: 6/12/2025
Construction Comments: 5.13.25 DERNCO #1 Reviewed complete and approved for payment. JD 5.12.25 DERNCO#1-GMunoz, complete and approved for payment at closing, invoice attached, photos uploaded to RW-CF 5.12.25 Replacement complete, waiting on completion docs-CF 5.9.25 Roof replacement still scheduled for today-CF 5.7.25 Roof replacement scheduled for 5/9-CF 5.6.25 Submit PO for DERNCO #1. No change to RFS Amt due to PO being paid at closing. LN 5.6.25 - Approved DERNCO 1 at $6,360. LA 5.6.25-DERNCO #1 Total $6,360.00-reviewe & submitted for approval. JD 5.6.25 DERNCO#1-GMunoz, submitted for approval $6360.00-CF 5.5.25 - Escrow Repair needed. Invoice to be paid at closing. Closing on 6/9/25. Seller to replace the roof with similar type by licensed professional. (Reference pages 11,12,13). LA 4.15.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 4.15.25 FW Passed, submitted for review-CF 4.14.25 Work complete, FW scheduled for 4/15-CF 4.9.25 Day 1 walk with GC-CF 4.8.25 Released POs to GC, promoted property to In Progress - LN 4.8.25 Added OECD 4.14.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $2959.20- Tenant Chg Back $3892.53)-LN 4.8.25 - Approved scope at $2,959.20. LA 4.8.25-Disposition scope submitted for approval, RFS total: $2,959.20- CRM promoted to Inspection Reviewed status. JD 4.8.25 Dispo scope submitted for review $2959.20-CF 4.3.25 Added-RW LN 4.3.25 - Inspection needed. Note: Agent mentioned evidence of previous foundation work. Let’s keep work to a minimum here, AS IS sale. Budgeted $5,000 for rehab to include: Exterior power wash, Landscape maintenance (refresh mulch, remove weeds and debris), Full interior clean, Address half bath leak under sink (Clint is already aware), Fence picket repair, Address any safety related issues. LA
Dispo Status: Sale Pending
Construction Manager: Clinton Fry
General Contractor: J F PRICE LLC
Property ID: TX18378
Market: San Antonio
Renovation Status: Complete Reviewed
Rehab for Sale: $0
Initial Scope Performed Date: 1/7/25
Initial Scope Approved Date: 1/8/25
Estimated Completion Date: 1/13/25
Rehab Verification Date: 1/13/25
Rehab for Sale Days: 5
Rehab Verified to ECD Delta: 0
Construction Comments: 2.26.25 Adhoc inspection performed-CF 2.5.25 Site visit, Adhoc inspection performed-CF 1.14.25-Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 1.13.25 FW passed, submitted for review-CF 1.9.25 Day 1 walk with vendor-CF 1.8.25 Released POs to GC, promoted property to In Progress - LN 1.8.25 Added OECD 1.13.25 , verified bed+ bath count, Added DRE Amt $0 (PO Amt $1180.47- Tenant Chg Back $5114.92)-LN 1.8.25 - Approved scope at $1,180.47. LA 1.8.25-Disposition scope submitted for approval, RFS total: $1,180.47- CRM promoted to Inspection Reviewed status. JD 1.7.25 Dispo scope submitted for review $1,195.48-CF 1.6.25 Added-RW LN 1.6.25 - Inspection needed. Note: Deep cracking at the driveway, possibly linked to foundation failure. Can’t see anything at interior to indicate a foundation issue. Please provide guidance on what you see regarding foundation. For now, keeping rehab to a minimum. Budgeted $5,000 for rehab to include: • Exterior power wash • Full interior clean • Replace burnt or missing light bulbs throughout. • Clean paint off LVP floors. • Reinstall bath fixtures. • HVAC service. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: J F PRICE LLC
Property ID: TXA0589
Market: San Antonio
Renovation Status: Complete Reviewed
Rehab for Sale: $0
Initial Scope Performed Date: 4/29/25
Initial Scope Approved Date: 4/30/25
Estimated Completion Date: 5/7/25
Rehab Verification Date: 5/6/25
Rehab for Sale Days: 6
Rehab Verified to ECD Delta: -1
Construction Comments: 5.7.25 Added RFS Amt $0 (PO Amt $1336.47 - Tenant Chg Back $1360) -LN 5.7.25- Final Walk approved. RW closed, RVD set, and home promoted to CR. DRCP approved for payment. JD 5.6.25 FW Passed submitted for review-CF 5.5.25 Work complete, FW scheduled for 5/7-CF 4.30.25 Day 1 walk with GC-CF 4.30.25 Released POs to GC, promoted property to In Progress - LN 4.30.25 Added OECD 5.5.25, verified bed+ bath count, Added DRE Amt $1336.47 (PO Amt $1336.47- Tenant Chg Back $0)-LN 4.30.25 - Approved scope at $1,336.47. Foundation home per CM. LA 4.29.25- Disposition scope submitted for approval, RFS total: $1,336.47- CRM promoted to Inspection Reviewed status. JD 4.29.25 Dispo scope submitted for review $1,336.47-CF 4.28.25 Added-RW LN 4.28.25 - Inspection needed. Budget is $4,500 for rehab to include the following: • Exterior power wash •Landscape maintenance (refresh mulch, remove weeds, trim large tree branches that are starting to hang above roof) • Fence repairs (currently being held up by a wood post) • Full interior clean • HVAC service • Adjust garage door at interior, won’t close unless it’s locked. • Evaluate roof for repairs or replacement. • Address any other safety hazards. LA
Dispo Status: Listed For Sale
Construction Manager: Clinton Fry
General Contractor: REIGN CONSTRUCTION
Property ID: TX18319
Market: San Antonio
Renovation Status: Rent Ready
Rehab Verification Date: 5/30/25
Construction Comments: 6.2.25 Added Actual Rehab Amt $52552.38 to CRM - LN 5.30.25-Final Walk approved. RW closed, RVD set, and home promoted to RR. IRCP approved for payment. JD 5.30.25 FW passed, submitted for review-CF 5.29.25 Work complete, final clean in the evening. Final walk scheduled 5/30-CF 5.28.25- CO#4 total $1,245.00 CO#5 (NEG PO-$89.00) reviewed and approved for PO. JD 5.28.25 CO#4 JF Price $1245 CO#5 ILG (-$89) submitted for approval-CF 5.27.25 Countertop install today-CF 5.20.25 Cabinet delivery today-CF 5.15.25 Shoe mold installation today-CF 5.12.25 Interior fixtures being installed-CF 5.9.25 Flooring complete-CF 5.5.25 Flooring scheduled for 5/7-CF 4.30.25 Paint complete, Scheduling flooring-CF 4.23.25 Paint in progress-CF 4.21.25 CO#3 total $4,434.50-reveiwed & approved for PO. Repair cost greater than 50% to replace. JD 4.21.25 CO#3-Air Perf Specialists, submitted for approval $4,434.50-CF 4.21.25 Roof replacement complete, submitted options for HVAC repairs to CM-CF 4.18.25 CO#2 total (NEG PO -$648.03) -reviewed and approved for PO. JD 4.18.25 CO#2, ILG, submitted for approval ($648.03) -CF 4.16.25 Trash out and paint prep complete-CF 4.11.25 Appliances delivered-CF 4.10.25 Day 1 walk with GC-CF 4.9.25 Released POs to GC, promoted property to Under Construction - LN 4.9.25 Added ECD , uploaded scope, ordered appliances, pending ETL, verified bed/bath count – LN 4.8.25 Legacy scope approved for PO(S), IR total: $47,671.27 + CO#1 Turn $1,080.00. JD 4/8/25 Reviewed scope with JD, confirmed master bath could accommodate double vanity. PJ 4.8.25-Legacy Scope submitted to PJ for approval. IR total $47,671.27 + CO #1 Turn Total $1,080.00. JD 4.7.25 Revised scope submitted for review $47,671.27 + CO#1 Turn -$1080.00-CF 4.7.25-CM to make scope edits and re-submit. JD 4.7.25 Legacy scope submitted for review $48,785.65-CF 4.7.25 Stage 1 marketing complete-CF 4.4.25 Promoted property to OFB, Added-RW, assigned to Clint, pending scope approval for Legacy POs LN ARP Property
Dispo Status: Rent Ready
Construction Manager: Clinton Fry
General Contractor: J F Price Llc
Property ID: TX21848
Market: San Antonio
Renovation Status: Rent Ready
Rehab Verification Date: 5/14/25
Construction Comments: 5.14.25 Added Actual Rehab Amt $46637.19 to CRM - LN 5.14.25-Final Walk approved. RW closed, RVD set, and home promoted to RR. IRCP approved for payment. JD 5.13.25 Final Walk passed, submitted for review-CF 5.12.25 Co #5 total $480.00, CO#6 total $980.00 reviewed and approved for PO. JD 5.12.25 CO#5, ILG, submitted $480 & CO#6, JF Price, submitted $980-CF 5.7.25 Exterior paint and repairs in progress-CF 5.5.25 Flooring complete, cabinet scheduled for tomorrow-CF 5.1.25- CO#4 Total (NEG PO -$912.08) reviewed and approved for PO. JD 4.30.25 CO#4-ILG, submitted for approval (912.08)-CF 4.28.25- CO#3 total $150.00 reviewed and approved for PO. JD 4.28.25 CO#3, JF Price, submitted for approval $150-CF 4.28.25 Interior paint complete, floor and cabinet demo to start today-CF 4.23.25 HVAC work scheduled for today-CF 4.21.25 CO#1 Total $1,045.00 CO#2 total $250.00- reviewed and approved for PO(s). JD 4.21.25 CO#1, Air Perf Specialists $1045.00 & CO#2, Nova Pest Control $250.00- Submitted for approval-CF 4.18.25 HVAC Service complete-CF 4.17.25 Day 1 walk with GC-CF 4.15.25 Released POs to GC, promoted property to Under Construction - LN 4.15.25 - Added ECD , uploaded scope, ordered appliances, pending ETL, verified bed/bath count – LN 4.15.25- Legacy scope approved for PO(S), IR total: $25,159.22. JD 4.15.25 Revised legacy scope submitted for review $25159.22-CF 4.15.25- reviewed scope with CF, CM to make edits and re-submit. JD 4.15.25 Legacy scope submitted for review $23,368.43-CF 4.14.25 Stage one marketing complete-CF 4.11.25 Added-RW, assigned to Clint, pending scope approval for Legacy POs- LN 4/10/25 - Emmanuel R - Pending review and approval J&B - pending approval - pending exterior trim paint and interior paint ILG - pending approval - carpet replacement needed in bedrooms SPW - 30 min IHM - clean and check ECD needed
Dispo Status: Rent Ready
Construction Manager: Clinton Fry
General Contractor: J F Price Llc
Property ID: TX22782
Market: San Antonio
Renovation Status: Rent Ready
Rehab Verification Date: 5/1/25
Construction Comments: 5/1/25 Added Actual Rehab Amt $42191.99to CRM - IR-NC Processed invoices for payment - JZ 5.1.25-Final Walk approved. RW closed, RVD set, and home promoted to RR. IRCP approved for payment. JD 5.1.25 FW passed, submitted for review-CF 4.30.25 Work complete- FW scheduled for 5/1-CF 4.29.25- CO#6 total $262.50- reviewed and approved for PO. JD 4.29.25 CO#6-JF Price- submitted for approval $262.50-CF 4.28.25 Finishing up today, waiting on countertop for kitchen island-CF 4.25.25 Countertop install scheduled for today-CF 4.21.25 Cabinet install today and countertop measurement tomorrow-CF 4.18.25 Flooring complete-CF 4.17.25 Exterior work near completion-CF 4.15.25-CO#5-total $398.35-reveiwed and approved for PO. JD 4.15.25 CO#5, ILG, submitted for approval $398.35-CF 4.15.25- CO#4 Total $325.00 reviewed and approved for PO. JD 4.15.25 CO#4 JF Price, submitted for approval, $325-CF 4.14.25 Waiting on cabinet delivery and install-CF 4.8.25 Exterior work in progress-CF 4.6.25- Interior Paint complete- HVAC repairs complete-CF 4.1.25- CO #3 Total $1,180.00 reviewed and approved for PO. JD 4.1.25- CO #2 Total $375.00 reviewed and approved for PO. JD 4.1.25 CO#3, JF Price, submitted for approval $1,180-CF 4.1.25 CO#2, Air Perf Specialist, HVAC Repair, submitted for approval $375-CF 3.31.25 Int Paint near completion-CF 3.27.25 Paint prep in progress, appliances on site-CF 3..25.25 Stage one marketing performed-CF 3.25.25 Cabinet demo in progress-CF 3.21.25 Day 1 Walk-CF 3.20.25 Released POs to GC, promoted property to Under Construction - LN 3.20.25 Added ECD , uploaded scope, ordered appliances, pending ETL, verified bed/bath count – LN 3.20.25-Legacy scope approved for PO(S), IR total: $37,846.47 & CO #1 Turn- $1200.00 JD 3.19.25 Revised scope submitted for review $39,049.47-CF 3.19.25 Scope edits needed by CM. JD 3.19.25 Legacy scope submitted for review $38,115.28-CF 3.19.25 Stage one marketing unable to be completed without yard sign-CF 3.17.25 Promoted property to OFB, Added-RW, assigned to Clint pending scope approval for Legacy POs LN
Dispo Status: Rent Ready
Construction Manager: Clinton Fry
General Contractor: J F Price Llc
BESbswy